All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of two-stage technology for anaerobic digestion of biomass and municipal waste

Public support

  • Provider

    Ministry of Environment

  • Programme

    Effiicient utilization of energy and renewable energy resources

  • Call for proposals

    SMZP610/4/00

  • Main participants

    CZ Biom - České sdružení pro biomasu, o. s.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Vývoj dvoustupňové technologie anaerobní digesce biomasy a komunálních odpadů

  • Annotation in Czech

    Návrh dvoustupňové bioplynové stanice s kompostárnou, s kontrolovaným fyzikálně technickým režimem procesu hydrolýzy a se zvýšením výkonu anaerobního fermentoru využitím výkonu anaerobního fermentoru využitím recirkulace hmot a využitím očkovacích nosičůa kontrolovaného teplotního a chemického režimu procesu. Variabilní faktory heldání optimálních podmínek zařízení budou způsoby mechanické úpravy substrátu, sušina vsázky, poměr C:N, vodivost, pH, ReOx potenciál, teplotní režim a obsah nutrientů.Studie proveditelnosti tohoto řešení bude s roční kapacitou 20 tisíc tun biomasy a bioodpadu a s produkcí elektrického proudu, tepla a stabilizovaného kompostu.

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    DM - Solid waste and its control, recycling

  • CEP - secondary branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - another secondary branch

    EI - Biotechnology and bionics

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20704 - Energy and fuels<br>20801 - Environmental biotechnology<br>20802 - Bioremediation, diagnostic biotechnologies (DNA chips and biosensing devices) in environmental management<br>20803 - Environmental biotechnology related ethics<br>20901 - Industrial biotechnology<br>20902 - Bioprocessing technologies (industrial processes relying on biological agents to drive the process) biocatalysis, fermentation<br>20903 - Bioproducts (products that are manufactured using biological material as feedstock) biomaterials, bioplastics, biofuels, bioderived bulk and fine chemicals, bio-derived novel materials<br>30401 - Health-related biotechnology<br>30402 - Technologies involving the manipulation of cells, tissues, organs or the whole organism (assisted reproduction)<br>30403 - Technologies involving identifying the functioning of DNA, proteins and enzymes and how they influence the onset of disease and maintenance of well-being (gene-based diagnostics and therapeutic interventions [pharmacogenomics, gene-based therapeutics])<br>30404 - Biomaterials (as related to medical implants, devices, sensors)<br>30405 - Medical biotechnology related ethics<br>40401 - Agricultural biotechnology and food biotechnology<br>40402 - GM technology (crops and livestock), livestock cloning, marker assisted selection, diagnostics (DNA chips and biosensing devices for the early/accurate detection of diseases) biomass feedstock production technologies, biopharming<br>40403 - Agricultural biotechnology related ethics

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The outputs of the project fulfilled the contract, were elaborated on a professional level and were delivered in appropriate form.

Solution timeline

  • Realization period - beginning

    Jan 1, 2003

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-MZP-SN-U/02:1

  • Data delivery date

    Jun 29, 2006

Finance

  • Total approved costs

    4,948 thou. CZK

  • Public financial support

    4,206 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    742 thou. CZK