All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimalization of road maintenance and repair for lowering the full-life costs.

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme of applied research and experimental development ALFA

  • Call for proposals

    ALFA 4 (STA02014TA04)

  • Main participants

    Vysoké učení technické v Brně / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    2014TA04031709

Alternative language

  • Project name in Czech

    Optimalizace návrhu údržby a oprav vozovek pro snížení jejich celoživotních nákladů

  • Annotation in Czech

    Cílem projektu je zpracovat inovativní metodu hodnocení stavu vozovek pozemních komunikací ve vztahu k jejím celoživotním nákladů. Jde o způsob sledování návrhových parametrů vozovek, který se ve výsledku uplatňuje ve výpočtovém, modelovém programu Layeps na zpřesnění výpočtů vrstevnatého poloprostoru, který se používá v České republice k návrhu vozovky. Vzhledem k nutnosti změn technických podmínek pro návrh vozovek týkající se kromě jiného i stanovení zpřesněných hodnot návrhových modulů pružnosti materiálů podkladních vrstev vozovky a podloží, bude důležité srovnat parametr stanovený laboratorně a in-situ při nedestruktivních rázových zatěžovacích zkouškách.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JM - Structural engineering

  • CEP - secondary branch

    JN - Civil engineering

  • CEP - another secondary branch

    JS - Reliability and quality management, industrial testing

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20102 - Construction engineering, Municipal and structural engineering<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The Opposition Panel agreed that the assignment was not fulfilled due to failure to meet all the declared results, however, the Contract was respected. As the beneficiary submitted the requested documents, the opinion was changed to "succeeded".

Solution timeline

  • Realization period - beginning

    Jul 1, 2014

  • Realization period - end

    Dec 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Feb 24, 2016

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP17-TA0-TA-U/07:1

  • Data delivery date

    Aug 15, 2019

Finance

  • Total approved costs

    2,244 thou. CZK

  • Public financial support

    1,434 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    810 thou. CZK