All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Finding ways to reduce emissions of pollutants and improving air quality in the settlements of the Czech Republic through traffic-organizational measures (realized in time) in relation to achieving the goals of air protection

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

  • Main participants

    HaskoningDHV Czech Republic, spol. s r.o.

  • Contest type

    VZ - Public procurement

  • Contract ID

    201605074

Alternative language

  • Project name in Czech

    Hledání cest ke snížení emisí znečišťujících látek a zlepšení kvality ovzduší v sídlech ČR pomocí dopravně-organizačních opatření (realizovaných v čase) ve vazbě na dosažení cílů ochrany ovzduší

  • Annotation in Czech

    • Shromáždění informací o realizaci dopravně-organizačních opatření v ČR a v evropských městech, zejména informací o dosaženém efektu ke snížení objemů dopravy, snížení emisí znečišťujících látek a zlepšení kvality ovzduší • Prokázání potenciálu realizace dopravně-organizačních opatření pro dosažení cílů v oblasti emisí (snížení emisí z automobilové dopravy a zejména v oblasti kvality ovzduší (dosažení imisních limitů v sídlech, v nichž jsou limity překročeny) v jednotlivých letech v kombinaci s dalšími uvažovanými (dopravními) opatřeními • Prověření variant aplikací dopravně-organizačních opatření (jednotlivých nebo v kombinaci) z hlediska dopadů na kvalitu ovzduší ale současně i na městskou mobilitu pro (velikostně i typově) charakteristická sídla v ČR • Návrh nejvhodnějších aplikací dopravně-organizačních opatření (jednotlivých nebo v kombinaci) pro sídla různého typu a velikosti, s cílem maximalizace efektu ke kvalitě ovzduší při zachování podmínek městské mobility v kombinaci s dalšími uvažovanými opatřeními v jednotlivých letech do roku 2020 a s ohledem na finanční možnosti jednotlivých obcí.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DI - Pollution and air control

  • CEP - secondary branch

    AP - Municipal, regional and transportation planning

  • CEP - another secondary branch

    DG - Atmospheric sciences, meteorology

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10509 - Meteorology and atmospheric sciences<br>10510 - Climatic research<br>10511 - Environmental sciences (social aspects to be 5.7)<br>50702 - Urban studies (planning and development)<br>50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The resort is ready to take the results after their formal adaptation because they meet the research needs. As of the date of the final opposition proceedings, it was not possible to check the insertion of results into the RIV due to the limited functionality of this database. The Commission draws the attention of the recipient to the obligation to promptly report the required and achieved results to the RIV as far as technically possible. In the case of any publications related to this project, it is necessary to have the consent of the owner of the result. Any unsolicited results by the provider can not be applied in the VAVAI IS. Furthermore, the District Representative was informed of the submission of the Implementation Report during the subsequent three years after the end of the project, which will be carried out through the IS BETA. The Commission proposes a project for administrative termination by the provider once the above obligations have been met by the investigator.

Solution timeline

  • Realization period - beginning

    May 1, 2016

  • Realization period - end

    Dec 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Jul 15, 2016

Data delivery to CEP

  • Confidentiality

    U - Předmět řešení projektu je utajovanou skutečností podle zvláštních právních předpisů nebo je skutečností, jejíž zveřejnění by mohlo ohrozit činnost zpravodajské služby. Údaje o projektu jsou upraveny tak, aby byly zveřejnitelné

  • Data delivery code

    CEP17-TA0-TB-U/03:1

  • Data delivery date

    Sep 4, 2017

Finance

  • Total approved costs

    1,325 thou. CZK

  • Public financial support

    1,325 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK