Technology Agency of the Czech Republic
Programme
Programme for funding of applied research and experimental development DELTA
Call for proposals
DELTA 4 (STA02018TF040)
Main participants
PT SOLUTIONS WORLDWIDE spol. s r.o.
Contest type
VS - Public tender
Contract ID
TF04000063 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
iLis
Annotation in Czech
Cílem projektu je vyvinout flexibilní systém pro volné kování, který bude schopen reagovat na aktuální stav kovaného dílu. Díky tomu bude možné optimalizovat celý proces kování bezprostředně po zjištění odchylky od navrhovaného postupu. Za tímto účelem bude navržena a zkonstruována informační síť mezi senzory na zařízeních a kontrolním řídícím systémem. Systém bude dále využívat simulace, jež umožní najít nejvhodnější proces kování.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
OECD FORD - secondary branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
OECD FORD - another secondary branch
20201 - Electrical and electronic engineering
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
AF - Documentation, librarianship, work with information<br>BC - Theory and management systems<br>BD - Information theory<br>IN - Informatics<br>JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Based on the partial completion and presentation of the recipient, it can be stated that all planned outputs were achieved. The recipient therefore complied with the project assignment given by the Agreement on the provision of support. Based on the available information, it can be stated that the foreign cooperation was ongoing and, despite the delay in activities on the part of the foreign partner, the results of the project were finally achieved. The delay was caused by a staff shortage on the part of the foreign partner. Thanks to foreign cooperation, benefits were mainly achieved in the area of acquiring know-how. The recipient declared that the foreign cooperation will continue even after the end of the project.
Solution timeline
Realization period - beginning
Jan 1, 2018
Realization period - end
Dec 31, 2019
Project status
U - Finished project
Latest support payment
Feb 28, 2019
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP20-TA0-TF-U
Data delivery date
May 12, 2023
Finance
Total approved costs
4,866 thou. CZK
Public financial support
3,594 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,270 thou. CZK