All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Influence of Seal Leakage Flows Interactions on Steam Turbine Efficiency

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme of applied research and experimental development EPSILON

  • Call for proposals

    EPSILON 2 (STA02017TH02)

  • Main participants

    Výzkumný a zkušební letecký ústav, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    2016TH02020086

Alternative language

  • Project name in Czech

    Vliv interakce proudění z ucpávek na efektivitu práce stupňů parních turbín.

  • Annotation in Czech

    Cílem projektu je detailně prostudovat vliv interakce proudění z ucpávek s hlavním proudem zejména v případech vysokotlakých a středotlakých dílů parních turbín. Jedná se o systematický výzkum tohoto složitého mechanismu proudění pomocí numerických i experimentálních přístupů s cílem jeho detailního popisu, sestavení ztrátového modelu a návrhu nového tvarování příslušných konstrukčních prvků. Vlivem nových konstrukčních řešení výtoku z ucpávek se očekává dodatečné zvýšení účinnosti stupňů 0.2 - 0.5%, v závislosti na specifických podmínkách konkrétního stupně.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    BK - Liquid mechanics

  • CEP - another secondary branch

    BJ - Thermodynamics

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10305 - Fluids and plasma physics (including surface physics)<br>20303 - Thermodynamics<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The main goals of the project were met by the solution and the expected results were achieved. The project design assumed an increase in the internal efficiency of turbines by 0.2 - 0.5%, which would lead to significant savings in primary energy. The measurement of the analysis of the effects on efficiency is dealt with in a detailed study attached to the Final Report, but the evaluation of the actual change in efficiency is not explicitly stated in it. The reason may be that the measurements were not performed on real turbines, but on models and functional samples. However, it can be stated that the invested funds were spent efficiently and will lead to significant savings in primary energy and also to a probable increase in competitiveness. Application and use of the results is ensured for all project participants.

Solution timeline

  • Realization period - beginning

    Jan 1, 2017

  • Realization period - end

    Dec 31, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2020

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP21-TA0-TH-U/02:1

  • Data delivery date

    Jun 30, 2021

Finance

  • Total approved costs

    22,527 thou. CZK

  • Public financial support

    13,417 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    9,144 thou. CZK