All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Early detection system of flue gas condensation for heat-exchanging surfaces and boiler parts

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme of applied research and experimental development EPSILON

  • Call for proposals

    EPSILON 2 (STA02017TH02)

  • Main participants

    SVÚM a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    TH02020108 - Dodatek 1 ke smlouvě

Alternative language

  • Project name in Czech

    Vývoj systému pro monitorování a prevenci korozně rizikových stavů v důsledku kondenzace spalin

  • Annotation in Czech

    Cílem projektu je vývoj a uvedení do praktického provozu systému pro detekci vzniku korozně rizikových stavů z důvodu kondenzace (kyselých)složek spalin. Tento systém je primárně určen pro energetické celky a hlavně studenější části kotlů kde je provoz ohrožen korozí pod rosným bodem.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

    JK - Corrosion and material surfaces

  • CEP - another secondary branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20506 - Coating and films<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The Board of Opponents agreed that the objectives of the project and the results of the project were achieved in accordance with the Contract for the provision of support, therefore it can be stated that the project succeeded according to the assignment.

Solution timeline

  • Realization period - beginning

    Nov 1, 2016

  • Realization period - end

    Dec 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2019

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP20-TA0-TH-U/10:1

  • Data delivery date

    May 12, 2021

Finance

  • Total approved costs

    4,456 thou. CZK

  • Public financial support

    2,665 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,791 thou. CZK