All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Technological and economic optimization of tertiary technologies for removing PPCPs from wastewater

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme of applied research and experimental development EPSILON

  • Call for proposals

    EPSILON 2 (STA02017TH02)

  • Main participants

    ENVI-PUR, s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    2016TH02030227

Alternative language

  • Project name in Czech

    Technická a ekonomická optimalizace terciárních technologií pro odstraňování PPCPs z odpadních vod

  • Annotation in Czech

    Cílem projektu je vývoj a ověření poloprovozní technologie vhodné pro terciární čištění odpadních vod od některých specifických polutantů (PPCPs – Pharmaceuticals and personal care products), z již vyčištěných odpadních vod, které umožní opětovné využívání vyčištěných odpadních vod. Navrhovaný projekt by se tedy zaměřil na konstrukci filtračního zařízení s granulovaným aktivním uhlím při řešení těchto okruhů témat: 1. Přenos výsledků z modelového měřítka na poloprovoz. 2. Vyřešení problematiky zanášení a čištění filtračního lože. 3. Stanovení optimální dávky granulovaného aktivního uhlí pro účinné odstranění sledovaných látek. 4. Určení časového intervalu pro výměnu filtračního lože. 5. Náklady na provoz této technologie, a jejich optimalizace, spočtené na 1 m3 vyčištěné odpadní vody.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DJ - Pollution and water control

  • CEP - secondary branch

    DN - Environmental impact on health

  • CEP - another secondary branch

    CI - Industrial chemistry and chemical engineering

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>30304 - Public and environmental health

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Formally, a project that has met all the obligations arising from the design and contractual documentation between the beneficiary and the provider. From a professional point of view, the objectives of the project were met (including quantification of solution performance), a set of results was created, which includes supporting results X-other well documenting the solution process and the idea of further use of results, three key application results (pilot plant, prototype and utility model) integrating outputs of the implementation of the project plan. If the right adaptation to business models, the setting up of appropriate marketing communication and the favorable changes in the field of access to water are used, it is realistic that the funds spent can be rewarded and returned in the form of sales and profits.

Solution timeline

  • Realization period - beginning

    Jan 1, 2017

  • Realization period - end

    Dec 31, 2019

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2019

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP20-TA0-TH-U/10:1

  • Data delivery date

    May 12, 2021

Finance

  • Total approved costs

    7,100 thou. CZK

  • Public financial support

    5,582 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,518 thou. CZK