Composite Insulating Constructions in Electrical Engineering
Project goals
The aim of the project is to create the insulating composite construction which is suitable as a substitution of steel crossarm and insulators. The solution will be designed using a glass fibre reinforced polymer. Additional surface insulation and surface length prolongation, as well as the overhead line holders, will be attached on the crossarm. The corrosion endurance, low weight and better mechanical properties are the benefits of the proposed solution of composite crossarm for HV overhead lines.
Keywords
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme of applied research and experimental development EPSILON
Call for proposals
EPSILON 3 (STA02017TH030)
Main participants
5M s.r.o.
Contest type
VS - Public tender
Contract ID
TH03020355 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Kompozitní konstrukce v elektrotechnice EKOM
Annotation in Czech
Předmětem projektu je izolační kompozitní konstrukce, která bude sloužit jako náhrada ocelové konzole a zároveň izolátoru v sítích VN. Řešení předpokládá využití kompozitního polymerního jádra se skleněnými vlákny, na němž budou vhodnou technologií napojeny prvky zajišťující dodatečnou elektroizolační vzdálenost a upínací prvky pro vodiče. Další přidanou hodnotou předkládaného řešení, mimo spojení funkcí několika stávajících komponent do jednoho prvku, je úspora nákladů, korozní odolnost, nižší hmotnost a lepší mechanické vlastnosti systému.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20704 - Energy and fuels
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JE - Non-nuclear power engineering, energy consumption and utilization
JI - Composite materials
JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the project evaluation hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Jan 1, 2018
Realization period - end
Dec 31, 2020
Project status
U - Finished project
Latest support payment
Feb 28, 2020
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP21-TA0-TH-U/02:1
Data delivery date
Jun 30, 2021
Finance
Total approved costs
24,257 thou. CZK
Public financial support
14,519 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
9,738 thou. CZK
Basic information
Recognised costs
24 257 CZK thou.
Public support
14 519 CZK thou.
59%
Provider
Technology Agency of the Czech Republic
OECD FORD
Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)
Solution period
01. 01. 2018 - 31. 12. 2020