Development of Selection Method of Measured and Communicated Delivery Points/Consumers for Progressive Deployment of Smart Grids
Project goals
The main project objective is the development of a method that will be capable of selection/reduction of measured and communicated delivery points with smart meters (SMs) and also will be able to reflect metrics technical shortcomings of SMs connected to low-voltage distribution networks. Measurement data collected from these selected points will be sufficient for current network condition evaluation, while the load of the communication route transmitting measurement information with required delay to the data concentrator will be reduced. The networks size and diversity and the concept of SMs extensive deployment establishment prove that development of this method will have demonstrably positive and innovative impact especially on the technically meaningful Smart Grids development.
Keywords
smart meterAMMsmart gridsdistribution networklow voltagemeasured node reductiondata post-processing
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research ZETA
Call for proposals
ZETA 2 (STA02018TJ020)
Main participants
Vysoké učení technické v Brně / Fakulta elektrotechniky a komunikačních technologií
Contest type
VS - Public tender
Contract ID
TJ02000006 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Vývoj metod výběru charakteristických OPM reálně použitelných při postupném zavádění inteligentních sítí
Annotation in Czech
Hlavním cílem projektu je vývoj metody, která je schopna dle požadovaného účelu provést výběr/redukci měřených a komunikovaných odběrných míst s chytrými elektroměry a současně je schopna reflektovat technické nedostatky metriky těchto elektroměrů připojovaných do distribučních sítí nízkého napětí. Údaj o měření z těchto vybraných charakteristických míst bude dostatečný pro posouzení aktuálního stavu sítě a současně bude odlehčeno zatížení komunikační cesty s cílem dopravení informací o měření do datové centrály s požadovaným zpožděním. Rozsáhlost a různorodost sítí nízkého napětí a zavádění koncepce plošného nasazení chytrých elektroměrů potvrzují, že vývoj metody bude mít prokazatelné pozitivní a inovativní dopady zejména na technicky smysluplný rozvoj Smart grids.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
20202 - Communication engineering and systems
OECD FORD - another secondary branch
20205 - Automation and control systems
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JD - Use of computers, robotics and its application
JW - Navigation, connection, detection and countermeasure
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the project evaluation hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Mar 1, 2019
Realization period - end
Dec 31, 2020
Project status
U - Finished project
Latest support payment
Feb 28, 2020
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP21-TA0-TJ-U/02:1
Data delivery date
Jun 30, 2021
Finance
Total approved costs
2,671 thou. CZK
Public financial support
2,271 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
401 thou. CZK
Basic information
Recognised costs
2 671 CZK thou.
Public support
2 271 CZK thou.
85%
Provider
Technology Agency of the Czech Republic
OECD FORD
Electrical and electronic engineering
Solution period
01. 03. 2019 - 31. 12. 2020