Implementing of the load-transfer method for optimisation of deep foundations design
Project goals
The objective of the proposed project are as follows: 1. Refinement of the deep foundations design (piles, micropiles) by the combination of the modern numerical and optimization method. 2. Quantification of the influence of governing parameters significantly affecting the bearing capacity of deep foundations and their explicit incorporation into the calculation. 3. More detailed calculation output (increase in the number of calculation results) - load-displacement dependence; distribution of shear stress, axial displacement and axial force along the foundation; pile toe stress; degree of the toe and shaft utilization. 4. Preparation of the program application for practical usage.
Keywords
load-transfer methodmetaheuristic optimisation techniquedeep foundationsshaft friction
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research ZETA
Call for proposals
ZETA 2 (STA02018TJ020)
Main participants
Vysoké učení technické v Brně / Fakulta stavební
Contest type
VS - Public tender
Contract ID
TJ02000140 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Implementace metody přenosových funkcí pro optimalizaci návrhu hlubinného zakládání staveb
Annotation in Czech
Cíle projektu jsou následující: 1. Zpřesnění statického návrhu hlubinných základů (pilot a mikropilot) s využitím kombinace moderní numerické a optimalizační techniky. 2. Kvantifikace vlivu důležitých faktorů ovlivňujících únosnost hlubinných základů a jejich explicitní zahrnutí do výpočtu. 3. Podrobnější výpočetní výstup (zvýšení počtu výsledků statického výpočtu) - závislost síla versus svislý posun; redistribuce plášťového tření, osového posunutí a osové síly podél základu; napětí na patě; stupeň využití paty a pláště. 4. Příprava programové aplikace pro praktické využití.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20101 - Civil engineering
OECD FORD - secondary branch
20701 - Environmental and geological engineering, geotechnics
OECD FORD - another secondary branch
20102 - Construction engineering, Municipal and structural engineering
DH - Mining industry including coal mining and processing
GB - Agricultural machines and construction
JM - Structural engineering
JN - Civil engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Based on the study of the documented final report, including appendices, it can be stated that the project succeeded according to the assignment. All activities were carried out in accordance with the project proposal. The project was solved with regard to the practical use of the results at a very good professional level. The outputs demonstrate the effective cooperation of both project partners.
Solution timeline
Realization period - beginning
Jun 1, 2019
Realization period - end
May 31, 2021
Project status
U - Finished project
Latest support payment
Feb 28, 2021
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP22-TA0-TJ-U
Data delivery date
Jun 30, 2022
Finance
Total approved costs
1,876 thou. CZK
Public financial support
1,554 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
293 thou. CZK
Recognised costs
1 876 CZK thou.
Public support
1 554 CZK thou.
0%
Provider
Technology Agency of the Czech Republic
OECD FORD
Civil engineering
Solution period
01. 06. 2019 - 31. 05. 2021