Certification Power Source for Small sources, supposed to be connected to LV Networks
Project goals
The objective of the project is to develop a Mobile Certification Power Source with a Power Module for verifying the conformity certificates for the Production Generating Modules with the requirements of Commission Regulation (EU) 2016/631 of 14 April 2016. This Certification Power Source will be the basis for a Certification Laboratory.
Keywords
certification power sourceregulatory sourceproduction generation modulerenewable sourcesSmart Gridsfrequencyvoltage
Public support
Provider
Technology Agency of the Czech Republic
Programme
Programme for funding of applied research, experimental development, and innovation THETA
Call for proposals
THETA 1 (STA02018TK010)
Main participants
EGC - EnerGoConsult ČB s.r.o.
Contest type
VS - Public tender
Contract ID
TK01020196 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Certifikační zdroj s výkonovým stupněm pro malé zdroje připojované do sítí nn
Annotation in Czech
Cílem projektu je vývoj mobilního certifikačního zdroje s výkonovým stupněm pro ověřování shody vlastností výrobních modulů s požadavky Nařízení Komise (EU) 2016/631 ze dne 14. dubna 2016. Tento certifikační zdroj bude základem certifikační laboratoře.
Scientific branches
R&D category
AP - Applied research
OECD FORD - main branch
20704 - Energy and fuels
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20206 - Computer hardware and architecture
JA - Electronics and optoelectronics
JB - Sensors, detecting elements, measurement and regulation
JC - Computer hardware and software
JE - Non-nuclear power engineering, energy consumption and utilization
JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the project evaluation hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Jul 1, 2018
Realization period - end
Dec 31, 2021
Project status
U - Finished project
Latest support payment
Feb 28, 2021
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP22-TA0-TK-U
Data delivery date
Jun 30, 2022
Finance
Total approved costs
21,386 thou. CZK
Public financial support
12,785 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
8,606 thou. CZK
Recognised costs
21 386 CZK thou.
Public support
12 785 CZK thou.
0%
Provider
Technology Agency of the Czech Republic
OECD FORD
Energy and fuels
Solution period
01. 07. 2018 - 31. 12. 2021