All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of a new coupling models for ETE between PARCS and TRACE in order to simulate 3D thermohydraulic and neutronic reactivity scenarios

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    Programme for funding of applied research, experimental development, and innovation THETA

  • Call for proposals

    STA02023TK050

  • Main participants

    Státní ústav radiační ochrany, v.v.i.

  • Contest type

    VS - Public tender

  • Contract ID

    TK05010155 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Vývoj spojeného systémového a deterministicky neutronového modelu jaderné elektrárny Temelín v kódech TRACE a PARCS pro simulaci abnormálních stavů s nesymetrickým neutronovým tokem

  • Annotation in Czech

    Cílem projektu je vyvinout a zavést do licenční a ověřovací praxe SÚJB pokročilé metody a výpočetní modely pro ověřování bezpečnostních parametrů primárního okruhu jaderné elektrárny Temelín. Účelem metodiky bude simulace scénářů, pro které je nutné zahrnout spojení neutronového a termohydraulického modelu. Projekt umožní vytvořit znalostní prostředí pro potřeby státní správy v oblasti expertního hodnocení abnormálních a havarijních režimů jaderných elektráren vyznačujících se nesymetrickým neutronovým tokem, využitelný nejenom, ale zejména pro potřeby licenčních řízení Státního úřadu pro jadernou bezpečnost

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20704 - Energy and fuels

  • OECD FORD - secondary branch

    10304 - Nuclear physics

  • OECD FORD - another secondary branch

    10305 - Fluids and plasma physics (including surface physics)

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    BG - Nuclear, atomic and molecular physics, accelerators<br>BK - Liquid mechanics<br>BL - Plasma physics and discharge through gases<br>JE - Non-nuclear power engineering, energy consumption and utilization<br>JT - Propulsion, engines and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The assessed project succeeded according to the assignment. The binding result of the project is computational models in the PARCS and TRACE codes, and a reliable and accurate methodology for coupling the TRACE and PARCS codes was developed and implemented. This methodology was implemented by creating a specialized script that simplifies the entire coupling process and addresses the absence of an automatic coupling function in the SNAP environment and the general lack of instructions for manual coupling of triangular systems. The methodology was validated by applying the developed script to the VVER-1000 reactor models in the PARCS and TRACE codes. The project also achieved progress in automating the coupling process in the SNAP environment. Due to the cooperation with the American regulator, the U.S. Nuclear Regulatory Commission, the level of implementation of the coupling function in SNAP has advanced and full integration is expected in the coming years.

Solution timeline

  • Realization period - beginning

    Feb 1, 2023

  • Realization period - end

    Dec 31, 2025

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2025

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP26-TA0-TK-U

  • Data delivery date

    Jun 23, 2026

Finance

  • Total approved costs

    9,546 thou. CZK

  • Public financial support

    8,592 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    955 thou. CZK