All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of non linear absorption driven optic system and proces for high throughput TGV formation

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    1.VS DELTA 2 (STA02019TM010)

  • Main participants

    Meopta - optika, s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    TM01000021 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Vývoj optické sestavy a procesu založeného na nelineární absorpci pro TGV

  • Annotation in Czech

    Cílem projektu je výzkum a vývoj technologie skládající se z optické sestavy a procesu založeného na nelineární absorpci pro TGV s využitím vice-svazkového obrábění, Besselovského svazku a KOH chemického leptání. Indikátory dosažení cíle projektu je simultánní vrtání více děr o průměru do 25 mikrometrů ve 100 mikrometrovém skleněném substrátu.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    10306 - Optics (including laser optics and quantum optics)

  • OECD FORD - secondary branch

    20501 - Materials engineering

  • OECD FORD - another secondary branch

    20101 - Civil engineering

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    BH - Optics, masers and lasers<br>JG - Metallurgy, metal materials<br>JN - Civil engineering<br>JP - Industrial processes and processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project succeeded according to the specifications, i.e. what was planned in the project proposal was fulfilled. The project fulfilled everything that was expected without reservations and the results have application potential. Partial tasks were solved according to the original assignment and according to the organized division between individual partners. As part of the international cooperation, the final system of process optics was created in 2022 and further incorporated modifications from the partner Philoptics, which was subsequently verified in the laboratories of Hilase and Philoptics. The outputs from the part dedicated to multi-volume machining were subsequently implemented in the KIMM laboratories, which was the finalization of the entire process. Furthermore, the effect on the achieved final TGV technology was observed, which led to the creation of an optomechanical design of an optical assembly for generating a field of Bessel bundles.

Solution timeline

  • Realization period - beginning

    Jan 1, 2020

  • Realization period - end

    Nov 30, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2022

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP23-TA0-TM-U

  • Data delivery date

    Dec 21, 2023

Finance

  • Total approved costs

    30,173 thou. CZK

  • Public financial support

    13,480 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,862 thou. CZK