All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Smart Flexible Manufacturing Planning and Monitoring System

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    3.VS DELTA 2 (STA02022TM030)

  • Main participants

    TGS nástroje-stroje-technologické služby spol. s r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    TM03000039 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Chytrý flexibilní systém plánování a monitorování výroby

  • Annotation in Czech

    Cílem projektu je vývoj systému pro inprocesní monitorování zatížení nástroje při obrábění a online predikci životnosti nástroje. Tento cíl je v souladu s vysoce aktuálním konceptem chytrého stroje a reaguje na požadavky vyšší efektivity, snižování nákladů, automatizace a lepšího plánování procesů. Řešení se specificky zaměřuje na uživatele strojů v segmentu malých a středních firem, pro které je potřeba nabídnout aplikačně jednoduchý produkt. Vyvinut bude funkční vzorek pro automatickou identifikaci reálného opotřebení nástroje. Toto řešení umožní předcházet buď neekonomické předčasné výměně nástrojů, nebo zhoršené kvalitě výsledků obrábění. Systém bude komunikovat s CNC řídicím systémem a bude využívat plně dostupné strojní parametry. Funkčnost systému bude ověřena testy na stroji.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20301 - Mechanical engineering

  • OECD FORD - secondary branch

    20205 - Automation and control systems

  • OECD FORD - another secondary branch

    20204 - Robotics and automatic control

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JD - Use of computers, robotics and its application<br>JR - Other machinery industry<br>JT - Propulsion, engines and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project met the main objectives set out in the support agreement. During the solution, partial objectives were achieved and in the final year, the set result: a functional sample of a system for monitoring the condition of the tool and process. This was verified in laboratory and operational conditions. The project documentation was complete and met the requirements of the provider. The professional level of the solution was very good. The project costs were reasonable. The result is practically usable, but commercial deployment requires further steps. Overall, the project can be assessed as successfully implemented in accordance with the plan. Cooperation with both foreign partners took place at the necessary level throughout the entire project solution, and all objectives were achieved on both the Czech and Taiwanese sides. The cooperation was always described in partial expert reports and in the final year in a separate report on behalf of the co-investigator, Buffalo Machinery.

Solution timeline

  • Realization period - beginning

    Jan 1, 2022

  • Realization period - end

    Dec 31, 2024

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2024

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP25-TA0-TM-U

  • Data delivery date

    Jun 26, 2025

Finance

  • Total approved costs

    14,438 thou. CZK

  • Public financial support

    10,526 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    3,913 thou. CZK