Commercialization at the Tomas Bata University in Zlin II
Project goals
The aim of the project is to support and significantly improve the current system of transfer of R&D results achieved at the Tomas Bata University in Zlín, to deepen the cooperation between the university and the application sphere and to strengthen applied research in all parts of the university (especially those with respect to the current status R&D outputs and their commercial potential that did not participate in the TG03010052 project). The objective will be achieved through sub-projects implemented in accordance with TBU’s strategic plan.
Keywords
Proof-of-conceptcommercialization systemcommercialization of research and development outputstechnology transfer, intellectual property
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
1.VS GAMA 2 (STA02019TP010)
Main participants
Univerzita Tomáše Bati ve Zlíně / Univerzitní institut
Contest type
VS - Public tender
Contract ID
TP01010006 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Komercializace na Univerzitě Tomáše Bati ve Zlíně II
Annotation in Czech
Cílem projektu je podpořit a významně zefektivnit stávající systém přenosu výsledků VaV dosažených na Univerzitě Tomáše Bati ve Zlíně do praxe, prohloubit tak spolupráci mezi univerzitou a aplikační sférou a posílit aplikovaný výzkum u všech součástí univerzity (zejména pak u těch, které s ohledem na aktuální stav VaV výstupů a jejich komerční potenciál neparticipovaly na projektu TG03010052). Cíle bude dosaženo prostřednictvím dílčích projektů realizovaných v souladu se strategickým záměrem UTB.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20501 - Materials engineering
OECD FORD - secondary branch
20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)
OECD FORD - another secondary branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
AF - Documentation, librarianship, work with information
BC - Theory and management systems
BD - Information theory
IN - Informatics
JG - Metallurgy, metal materials
JI - Composite materials
JP - Industrial processes and processing
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
These are preliminary data, the project evaluation hasn´t proceeded yet.
Solution timeline
Realization period - beginning
Jan 1, 2020
Realization period - end
Dec 31, 2022
Project status
U - Finished project
Latest support payment
Feb 28, 2022
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP23-TA0-TP-U
Data delivery date
Jun 30, 2023
Finance
Total approved costs
11,131 thou. CZK
Public financial support
11,100 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK
Recognised costs
11 131 CZK thou.
Public support
11 100 CZK thou.
0%
Provider
Technology Agency of the Czech Republic
OECD FORD
Materials engineering
Solution period
01. 01. 2020 - 31. 12. 2022