All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Hybrid thermal energy storage with the diurnal accumulation cycle designed for selected renewable energy sources kinds.

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    STA02024TS010

  • Main participants

    České vysoké učení technické v Praze / Fakulta strojní

  • Contest type

    VS - Public tender

  • Contract ID

    TS01030028 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Hybridní akumulace tepelné energie s mezidenním akumulačním cyklem určené pro vybrané typy obnovitelných zdrojů energie.

  • Annotation in Czech

    Cílem projektu je sestavení basic design akumulátoru tepla s mezidenním akumulačním cyklem ve dvou teplotních hladinách: nižší (do 200 °C) a vyšší (do 500 °C). Akumulátory jsou použitelné pro efektivní spolupráci s OZE: plynovými kogeneračními jednotkami pro nižší teploty, nebo s přebytky výroby fotovoltaických elektráren pro vyšší teploty; oba zdroje do výkonu 1 MW. Akumulace je založena na unikátní kombinaci citelného tepla kapalin a využitelných reakčních energií vratných reakcí se silným tepelným zabarvením, které dnes existují pouze v laboratorních podmínkách. Řešení cílí na dosažení akumulační hustoty o 40 % vyšší než srovnatelné stávající vodní akumulátory a měrných nákladů na akumulovanou energii o 40 % nižších, než dosahují akumulátory na bázi aditivovaných ropných parafinů.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20704 - Energy and fuels

  • OECD FORD - secondary branch

    20303 - Thermodynamics

  • OECD FORD - another secondary branch

    20402 - Chemical process engineering

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    BJ - Thermodynamics<br>CI - Industrial chemistry and chemical engineering<br>JE - Non-nuclear power engineering, energy consumption and utilization<br>JT - Propulsion, engines and fuels

Solution timeline

  • Realization period - beginning

    Jun 1, 2024

  • Realization period - end

    May 31, 2029

  • Project status

    B - Running multi-year project

  • Latest support payment

    Feb 28, 2024

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP25-TA0-TS-R

  • Data delivery date

    Feb 20, 2025

Finance

  • Total approved costs

    24,655 thou. CZK

  • Public financial support

    20,949 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    3,706 thou. CZK