All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The Optimization of algorithm for building heating according to the time schedule

Public support

  • Provider

    Liberecký kraj

  • Programme

    Regional Innovation Programme of the Liberec Region Grant Fund

  • Call for proposals

    Dotační fond Libereckého kraje 4 (SKLI201600001)

  • Main participants

    ADDAT s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    OLP/516/2016

Alternative language

  • Project name in Czech

    Optimalizace algoritmu pro vytápění budov dle časového plánu

  • Annotation in Czech

    Optimalizace algoritmu ekonomického řízení provozu vytápění budovy v režimu náběhu a útlumu; zajistit dosažení požadované teploty v budově těsně před počátkem provozní doby (např. aby ve třídách ve škole bylo v 7:30 21°C) a umožnit optimální pokles teploty v útlumovém režimu. Cílem aplikace optimalizovaného algoritmu je udržet vysokou kvalitu tepelné pohody a dosáhnout při provozu co nejvyšších úspor energie při vytápění s ohledem na systém vytápění v budově a na tepelný charakter budovy; předpoklad 5% snížení spotřeby energie pro vytápění.

Scientific branches

  • R&D category

    IN - Innovation

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The rise time of the system is dependent on the outside temperature under the current conditions. A fixed heat schedule does not allow a reduction in the temperature of the dampening. Ensuring the required temperature at the time of pupils' arrival at school is very difficult when it comes to economical operation. The current system delivers about 5% heat savings compared to the system without attenuation. A further reduction in heat consumption for heating could be achieved by interrupting heating during the damping for as long as possible. The actual start of the system would have to be commenced depending on the actual indoor temperature and the outside temperature estimation (predictable temperature data can be supplied by the contractor if required). In the case of successful use of this control system, additional heat savings of 7 to 9% (compared to the current state) could occur.

Solution timeline

  • Realization period - beginning

    Jan 5, 2016

  • Realization period - end

    May 31, 2016

  • Project status

    U - Finished project

  • Latest support payment

    Mar 16, 2016

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP17-KLI-UD-U/01:1

  • Data delivery date

    Aug 4, 2017

Finance

  • Total approved costs

    84 thou. CZK

  • Public financial support

    59 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    25 thou. CZK