All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Wax Casting Technology change for Musical Instrument Keywork Parts

Public support

  • Provider

    Karlovarský kraj

  • Programme

    Programme of competitiveness development of Karlovy Vary Region - Innovation voucher

  • Call for proposals

    Inovační vouchery KVK 4 (SKKV201500001)

  • Main participants

    AMATI - Denak, s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    01748/2015-00

Alternative language

  • Project name in Czech

    Úprava technologie lití klapek mechanik dechových nástrojů

  • Annotation in Czech

    Vytipování výrobků s nedostatečně navrženou vtokovou soustavou. Úprava vtokových soustav tak, aby byly odstraněny zjištěné defekty. Simulace změn pomocí numerických výpočtů s využitím nejmodernějších softwarových procesů. Podchycení dosažených změn zlepšenými mechanickými vlastnostmi, odstraněním vad a zvýšením homogenity odlitku. Snížení zmetkovitosti výroby i zlepšením vstupních polotovarů - vsázky. Zlepšení kvality formovací směsi tak, aby se zabránilo plynovým bublinám a také bylo možné najít dalšívyužití sádrové formovací směsi.

Scientific branches

  • R&D category

    IN - Innovation

  • CEP classification - main branch

    JR - Other machinery industry

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20301 - Mechanical engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    On the given alloysthere have been analyzed interval defectsand their structural state. Basešd on these findings simulations were carried out to optimize intake systems that were tested in practice. During the project semifinished items had been checked - granulated alloys (fornace batch). Finished products had been analyzed in regard to their mechanical teatures and defects. These findings were given into corellation with given changes/odjustments in order to use these findings for next alloys. Attention was given to gypsum mixed used for form was achieved resulting in lower defect alloys and better use of gypsum mixes.

Solution timeline

  • Realization period - beginning

    Feb 1, 2015

  • Realization period - end

    Oct 31, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Jun 23, 2015

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-KKV-UE-U/01:1

  • Data delivery date

    Oct 10, 2017

Finance

  • Total approved costs

    184 thou. CZK

  • Public financial support

    152 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    32 thou. CZK