All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Advanced system of prevention and reduction of consequences for spread of hazardous air in integrated rescue system

Public support

  • Provider

    Ministry of Interior

  • Programme

  • Call for proposals

    SMV02022VB001

  • Main participants

    DEKONTA, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    VB01000054

Alternative language

  • Project name in Czech

    Pokročilý systém prevence a snížení následků šíření nebezpečného vzduchu v rámci IZS

  • Annotation in Czech

    Projekt si klade za cíl pomocí systematického experimentálního vývoje posoudit uplatnitelnost nového technologického postupu Plasmicat v rámci zabezpečení objektů či záchranných operací pro případ řešení krizové situace spojené s šířením nebezpečného agens v ovzduší.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • OECD FORD - secondary branch

    30304 - Public and environmental health

  • OECD FORD - another secondary branch

    20402 - Chemical process engineering

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    CI - Industrial chemistry and chemical engineering<br>DI - Pollution and air control<br>DJ - Pollution and water control<br>DK - Contamination and decontamination of soil including pesticides<br>DL - Nuclear waste, radioactive pollution and control<br>DM - Solid waste and its control, recycling<br>DN - Environmental impact on health<br>DO - Protection of landscape<br>FM - Hygiene

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The objectives set out in the project proposal have been met. The main results of the project have been achieved. All results are directly linked to the objectives of the project and were created during the project solution.

Solution timeline

  • Realization period - beginning

    Jan 1, 2022

  • Realization period - end

    Dec 31, 2023

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2023

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP24-MV0-VB-U

  • Data delivery date

    Jun 21, 2024

Finance

  • Total approved costs

    13,601 thou. CZK

  • Public financial support

    8,501 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,100 thou. CZK