All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Using related GNSS safe applications for elimination safe and security risk by transport dangerous goods at different kind of transport infrastructure

Public support

  • Provider

    Ministry of Interior

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    VZ - Public procurement

  • Contract ID

    MV-99671-58/VZ-2010

Alternative language

  • Project name in Czech

    Využití návazných aplikací GNSS se zárukou bezpečnosti pro eliminaci bezpečnostních rizik při přepravě speciálních zásilek na různých částech a druzích dopravní infrastruktury a pro snížení ohrožení zdraví obyvatelstva

  • Annotation in Czech

    Předmětem řešení projektu je vytvoření koncepce mezinárodně kompatibilního informačního systému na bázi globálních systémů družicové navigace pro automatické sledování průběhu přepravy vysoce rizikových nebezpečných věcí.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JW - Navigation, connection, detection and countermeasure

  • CEP - secondary branch

    JA - Electronics and optoelectronics

  • CEP - another secondary branch

    JO - Land transport systems and equipment

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20201 - Electrical and electronic engineering<br>20202 - Communication engineering and systems<br>20203 - Telecommunications

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The targets set in the project proposal have been met. The planned results have the anticipated potential for a practical use. All results are directly linked to the objectives of the project and incurred during the project.

Solution timeline

  • Realization period - beginning

    Jan 1, 2012

  • Realization period - end

    Jun 30, 2014

  • Project status

    U - Finished project

  • Latest support payment

    Aug 23, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP15-MV0-VF-U/01:1

  • Data delivery date

    Jun 30, 2015

Finance

  • Total approved costs

    4,990 thou. CZK

  • Public financial support

    4,990 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK