Research of methods to control water contaminated by toxic substances when unusual security situation
Project goals
The project subject is an applied research with a goal to find simple, fast and reliable methods that are enough sensitive not-expensive and field analysis for both CWA and TICs ? useable for the chemical and hygienic water control in extraordinary security situations.
Keywords
Water controlToxic agents detectionCWA detection in waterTICs detection in water
Public support
Provider
Ministry of Interior
Programme
Security Research for the Needs of the State 2010-2015
Call for proposals
Program bezpečnostního výzkumu 1 (SMV02010BV001)
Main participants
—
Contest type
VS - Public tender
Contract ID
MV-75002-9/OBV-2010
Alternative language
Project name in Czech
Výzkum metod kontroly vody kontaminované toxickými látkami za mimořádných bezpečnostních situací
Annotation in Czech
Předmětem projektu je aplikovaný výzkum, jehož cílem je nalézt, vypracovat a navrhnout jednoduché, rychlé, spolehlivé a přitom dostatečně citlivé, finančně a ekonomicky nenáročné metody in situ analýzy bojových chemických látek a jiných toxických chemikálií, vhodné pro chemickou a zdravotnickou kontrolu pitné a užitkové vody v podmínkách mimořádných bezpečnostních situací.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
CB - Analytical chemistry, separation
CEP - secondary branch
CI - Industrial chemistry and chemical engineering
CEP - another secondary branch
—
10406 - Analytical chemistry
20401 - Chemical engineering (plants, products)
20402 - Chemical process engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Objectives set out in the project proposal were met. All results outlined in project proposal were met. Patent was replaced by 3x F (Result of legal protection - the utility model). Beyond the paln several publication results were achived. All results are directly linked to the objectives of the project and were created during the project. The funds were used effectively.
Solution timeline
Realization period - beginning
Oct 1, 2010
Realization period - end
Dec 31, 2013
Project status
U - Finished project
Latest support payment
Feb 26, 2013
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP14-MV0-VG-U/01:1
Data delivery date
Jun 30, 2014
Finance
Total approved costs
3,867 thou. CZK
Public financial support
3,319 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
548 thou. CZK
Basic information
Recognised costs
3 867 CZK thou.
Public support
3 319 CZK thou.
85%
Provider
Ministry of Interior
CEP
CB - Analytical chemistry, separation
Solution period
01. 10. 2010 - 31. 12. 2013