All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Safe crowd evacuation with using of the advanced simulation of pedestrian and fire dynamics

Public support

  • Provider

    Ministry of Interior

  • Programme

    Security Research for the Needs of the State 2010-2015

  • Call for proposals

    Program bezpečnostního výzkumu 3 (SMV02013BV003)

  • Main participants

    Vysoké učení technické v Brně / Fakulta stavební

  • Contest type

    VS - Public tender

  • Contract ID

    MV-14556-5/OBVV-2013

Alternative language

  • Project name in Czech

    Bezpečná hromadná evakuace osob s využitím pokročilých simulací davové dynamiky a požáru

  • Annotation in Czech

    Analýza procesu evakuace osob v průběhu velkých sportovních a společenských událostí na základě moderních technik simulace davové dynamiky, šíření požáru a kouře. Pomocí těchto výsledků dojde ke stanovení efektivních opatření vedoucích ke zvýšení bezpečnosti účastníků těchto akcí a poskytnutí zasahujícím složkám přístup k využití moderních technik simulace dynamiky davu a šíření požáru.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    AQ - Safety and health protection, safety in operating machinery

  • CEP - secondary branch

    JD - Use of computers, robotics and its application

  • CEP - another secondary branch

    JN - Civil engineering

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20204 - Robotics and automatic control<br>20205 - Automation and control systems<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The targets set in the project proposal have been met. The main results of the project-Software and Certified methodology-were achieved. The project also reported byproducts. All the results are directly linked to the objectives of the project and incurred during the project.

Solution timeline

  • Realization period - beginning

    Apr 1, 2013

  • Realization period - end

    Dec 31, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Mar 2, 2015

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-MV0-VG-U/02:1

  • Data delivery date

    Mar 20, 2017

Finance

  • Total approved costs

    3,544 thou. CZK

  • Public financial support

    3,544 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK