All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Detection of Defence Perimeter Disturbance by Instaneous Changing of Optical Signal Polarization

Public support

  • Provider

    Ministry of Interior

  • Programme

    Security Research Programme of the Czech Republic in the years 2015 - 2022 (BV III / 1 VS)

  • Call for proposals

    Bezpečnostní výzkum České republiky 3 (SMV02018BV003)

  • Main participants

    Masarykova univerzita / Ústav výpočetní techniky

  • Contest type

    VS - Public tender

  • Contract ID

    Č.j.MV-55800-6/OBVV-2019

Alternative language

  • Project name in Czech

    Detekce narušení obranného perimetru pomocí okamžité změny polarizace optického signálu

  • Annotation in Czech

    Cílem projektu je vývoj nového systému detekce narušení obranného perimetru na bázi využití polarizačních vlastností speciální typů optických vláken. K tomu účelu bude vyvinut nový PM senzor pro detekci vibrací a systém kaskádního zapojení sady takových senzorů pomocí technologie DWDM včetně podpůrné elektroniky. Tento systém odstraní nevýhody existujících optovláknových detektorů.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20201 - Electrical and electronic engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The objectives set out in the project proposal have been met. The main results of the project have been achieved. All results are directly linked to the objectives of the project and were created during the project solution.

Solution timeline

  • Realization period - beginning

    Sep 1, 2019

  • Realization period - end

    Dec 31, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Sep 2, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP23-MV0-VI-U

  • Data delivery date

    Jun 22, 2023

Finance

  • Total approved costs

    24,932 thou. CZK

  • Public financial support

    24,932 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK