Filters
The impact of the normalisation of interest rates on risk management (GA20-00178S)
institutions during of the normalisation of interest rates. Moreover, we will propose new central banks around the world reduce monetary policy rates to very low levels, which sometimes included negative rates. T...
Finance
- 2020 - 2023 •
- 2 866 tis. Kč •
- 2 866 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2020 - 30. 6. 2023
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Emerging financial risks during a global low interest rate environment (GA17-02509S)
In many countries, central banks have set basic interest rates to zero or even negative. Such new situation will affect risk management modelling in financial institutions and financial markets' infrastructure. The overall aim of th...
AH - Ekonomie
- 2017 - 2019 •
- 4 323 tis. Kč •
- 4 323 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2017 - 31. 12. 2019
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Correlations Problems in Financial Risk Management (GA402/09/0380)
The project will deal with the models of correlation between interest rate and credit risk and with their sensitivity analysis with respect to input parameters. We direction will be devoted to modeling of the random part of the
AH - Ekonomie
- 2009 - 2011 •
- 2 275 tis. Kč •
- 2 275 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Complex analysis of the german foreign policy (RM 07/01/10)
Rate Matches or Differences in interest and approaches to foreign policy issues of Czech Republic and Germany...
AD - Politologie a politické vědy
- 2010 - 2010 •
- 202 tis. Kč •
- 202 tis. Kč •
- MZV
Řešení projektu: 1. 1. 2010 - 31. 1. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo zahraničních věcí
Reaction Function of Central Bank and Government in Macroeconomic Equilibrium Adjustment Process (Simulation Model of Open Economy) (GA402/03/1292)
of the transmission mechanism of interest rates and to an analysis of expectationsof inflation, interest rates and exchange rates. The model will have these four sectors: the sector......
AH - Ekonomie
- 2003 - 2005 •
- 1 630 tis. Kč •
- 1 630 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Rate control and morphosynthesis in magnesium phosphate cements role of additives (GA20-01280S)
Magnesium phosphate ceramics have attracted research interest as alternative. For applications, the fast reaction rates are detrimental to the properties and don’t allow for enough working time. Few additives have been tested to slo...
Materials engineering
- 2020 - 2022 •
- 5 365 tis. Kč •
- 5 365 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Competitiveness and Exchange Rate Institutions and Innovations (GA16-02392S)
exchange rate (RER) misalignments (under-/overvaluation), trends in international competitiveness, and economic growth. The topic was inspired by the long-term interest) focusing on the impact of exchange rate misalignment...
AH - Ekonomie
- 2016 - 2020 •
- 4 847 tis. Kč •
- 4 412 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2016 - 11. 12. 2020
Uznané náklady
Podpora ze státního rozpočtu (91%)
Poskytovatel: Grantová agentura České republiky
A new approach to test uncovered interest rate parity (GA402/00/0814)
Empirical researchers tend to reject the Uncovered Interest Rate Parity hypothesis Since the failure of the UIP would have serious consequences for economic theory and praxis too, voluminous literature exists that tries to explain t...
AH - Ekonomie
- 2000 - 2000 •
- 190 tis. Kč •
- 190 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Econometric Analysis of the Efficiency of Monetary Policy in the Period of Transition in the Czech Economy (GA402/03/1299)
consequences for GDP, inflation rate, unemployment, interest rates, exchange rates...
AH - Ekonomie
- 2003 - 2005 •
- 1 257 tis. Kč •
- 1 257 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Application of the Fuzzy-Stochastic Approaches in Financial Decision-making (GA402/02/1046)
Project is focused mainly on a verifying of fuzzy-stochastic methodology under financial decision-making with Czech Republic financial environment application aspects. The goal is to verify mainly the fuzzy-stochastic portfolio models, forecasting mo...
AE - Řízení, správa a administrativa
- 2002 - 2004 •
- 1 127 tis. Kč •
- 1 065 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (94%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 3 682