All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

8 884 (0,124s)

Project

Material use of waste insulating asphalt materials in the production of asphalt mixtures (CL01000187)

from waste asphalt insulating materials in order to reduce use of natural materialsThe production of asphalt mixtures in the Czech Republic reaches approximately on the environment in the form of consumpt...

Civil engineering

  • 2024 - 2026
  • 5 586 tis. Kč
  • 4 108 tis. Kč
  • TA ČR
Project

New Additives for Increasing the Proportion of the R-material in Asphalt Mixtures (TH02010349)

The aim of the project is the use of secondary raw materials as additives for additive recycled materials (R-materials) in order to increase their use in asphalt mixtures suitable for the repair and construction of...

JM - Inženýrské stavitelství

  • 2017 - 2019
  • 16 875 tis. Kč
  • 10 103 tis. Kč
  • TA ČR
Project

Use of higher amounts of reclaimed material in asphalt mixtures with PmB bitumen (CK01000158)

The aim of the project is to develop asphalt mixtures using higher amount of reclaimed material in combination with PmB asphalt binders. This type of asphalt mix should allow the use of about 20% to 50% R-mater...

Civil engineering

  • 2020 - 2023
  • 11 906 tis. Kč
  • 8 888 tis. Kč
  • TA ČR
Project

Modified Asphalt Binders for Application of R-materials to Asphalt Mixtures (FW01010512)

of degraded asphalt binder in the R-material and will enable its further use in the production of new asphalt mixtures. Liquid asphalt additives will be prepared exclusivelyThe aim of the project is to prepare and...

Chemical engineering (plants, products)

  • 2020 - 2022
  • 16 365 tis. Kč
  • 9 818 tis. Kč
  • TA ČR
Project

The most effective utilization of reclaimed asphalt pavement layers for production of new asphalt mixes (TA02030549)

The goal of the project is to work out the technology of recycling of asphalt mixtures into the new produced mixtures, so that a high amount of milled or crashed old asphalt (RAP) could be used. RAP should be used in highest possibl...

JM - Inženýrské stavitelství

  • 2012 - 2014
  • 6 685 tis. Kč
  • 4 143 tis. Kč
  • TA ČR
Project

Rejuvenating agents for the extension of pavement lifetime with the use of a higher amount of Reclaimed Asphalt Pavement materials (TJ01000248)

significantly influence the quality and especially the life span of the asphalt roads. At the same time, agents allow the dosage of higher amounts of RAP material into asphalt that return to the aged asphalt binde...

JN - Stavebnictví

  • 2017 - 2019
  • 3 435 tis. Kč
  • 2 908 tis. Kč
  • TA ČR
Project

Effect of feedstock composition and preparation conditions on properties of road asphalts (GA103/99/1269)

Properties of road asphalts are influenced by the character of initial petroleum raw-material. In the case of the semi-blown asphalts , their properties depend. Properties of road asphalts are evaluated by standard...

CI - Průmyslová chemie a chemické inženýrství

  • 1999 - 2001
  • 2 614 tis. Kč
  • 2 083 tis. Kč
  • GA ČR
Project

Dissipated asphalt mixtures (FV10526)

The aim of the project is to develop hot asphalt mixtures that dissipates failures. New asphalt mixtures will be developed with the aim to resist to permanent in other forms of energy). The project will be aimed on dissipated a...

JN - Stavebnictví

  • 2016 - 2018
  • 6 692 tis. Kč
  • 5 235 tis. Kč
  • MPO
Project

Reducing oil dependency in the production of flexible pavements (CL01000060)

The aim of the project is to develop asphalt mixtures that can withstand the conditions of road construction in 21th century i.e. reducing energy consumption, increasing material re-use and using alternative materials. Thes...

Civil engineering

  • 2024 - 2026
  • 4 955 tis. Kč
  • 3 540 tis. Kč
  • TA ČR
Project

Separation of RAP - ekological application (EG19_262/0020077)

and innovative way of processing recycled asphalt so as to allow its further use in asphalt separation line and to develop a new asphalt mixture that will be completely different from the hitherto available recycled ma...

Chemical process engineering

  • 2020 - 2023
  • 45 320 tis. Kč
  • 0 tis. Kč
  • MPO
  • 1 - 10 out of 8 884