Filters
The assessment of mining subsidence boundaries and verification of expected surface subsidence (AACBU39-05)
The verification and analysis of current mining subsidence calculation methodology and prognosis of mining subsidence in Ostrava-Karvina Coal Basin.The proposal of upgrade of Notice No. 415/1991 Coll. in sense of assessment of mini...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2005 - 2006 •
- 4 284 tis. Kč •
- 4 284 tis. Kč •
- ČBÚ
Řešení projektu: 1. 1. 2005 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Český báňský úřad
Dynamics of mining subsidence basin and its incidence on mining region (GA105/00/1078)
The proposal of the project has logical contact with the resultes of solved project no. 105/97/0887 "Geodynamic effects in mining subsidence basin based points : - dynamics of process of formation of mining subsidence basin and its ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2000 - 2001 •
- 200 tis. Kč •
- 200 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
New methods of prognosis of surface subsidence affected by underground exploitation of ore vein deposits of Rožná type (GP105/02/P026)
. However,prognosis of development of subsidence depressions above ore vein deposits of proposer of grant project a newly conceived mechanism of genesis of subsidence then enables by means of mathematical modeling of surface sub...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2002 - 2004 •
- 1 051 tis. Kč •
- 523 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Grantová agentura České republiky
Physical geodetic processes in subsidence trough based on geodetic surveyins 'in situ' and their influence on territory affected by coal mining (GA105/97/0887)
Proposed project follows logically with results of solution of Grant project No: 105/931192 "Theory of Subsidence Trough, its Further Stages of Development and its of proposed project: Dynamic of subsidence through forming in areas ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 280 tis. Kč •
- 280 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Interferometric determination of subsidences caused by undermining by permanent scatters and phase unwrapping correction within (GA205/08/0452)
The project goal is to use interferometric stack processing in the region affected by undermining combined with open-cast mining which is partly covered by vegetation for subsidence detection. Urban objects are built on the waste dump and th...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2008 - 2010 •
- 2 958 tis. Kč •
- 2 958 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Complex study of reclamation of slurry ponds and subsidence depressions in the context of landscape revitalisation after mining activity (GA105/01/0304)
Consequences of mining require large volumes of materials suitable for land reclamation of slurry ponds and subsidence depressions. This problem has many unknowns. Where can be obtained volumes of hundreds thousands cubic metres of materials...
DD - Geochemie
- 2001 - 2003 •
- 3 367 tis. Kč •
- 1 950 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2001 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Grantová agentura České republiky
Analyse of variants of method room and pillar applicabled for exploitation of the coal deposits, fixed by protective pillar of the spa Darkov and of the town .. (GA105/97/0403)
The research will be made for mine Darkov, OKD a.s. company. The attention will be paid to geomechanical properties of coal and attendant rocks of the fill material and to the technology of exploitation followed with a very limited surface subsid...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 789 tis. Kč •
- 499 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (63%)
Poskytovatel: Grantová agentura České republiky
The Theory of Subsidence Area, Their Further Development and the Environmental Effects in the Mining Region (GA105/93/1192)
DB - Geologie a mineralogie
- 1993 - 1995 •
- 200 tis. Kč •
- 400 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1995
Uznané náklady
Podpora ze státního rozpočtu (200%)
Poskytovatel: Grantová agentura České republiky
The possibility of providing subsidized microcredits to vulnerable persons, microenterprises and social enterprises (TB05MPSV010)
Via an thorough analysis and proposals of legislative changes to allow • groups of people furthest from the labour market (mothers on maternity leave, older people, young people, the unemployed) to launch - with the help of subsidized microc...
AE - Řízení, správa a administrativa
- 2016 - 2016 •
- 388 tis. Kč •
- 388 tis. Kč •
- TA ČR
Řešení projektu: 7. 4. 2016 - 30. 9. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Technologická agentura ČR
The reclamation of flooded mine subsidence and sedimentation reservoirs in the Upper Silesian Mining Landscape (GA105/06/1242)
ecosystems of subsidence troughs and settling basins. The project deals with yet...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2006 - 2008 •
- 988 tis. Kč •
- 988 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2006 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 35