Filters
Spindle dynamics and chromosome segregation during oocyte meiotic maturation (LTAUSA17097)
: 1. Role of Ran.GTP in spindle formation and maintenance 2. Function of Aurora-A - CDC25B signalling in spindle integrity 3. Role of Aurora kinase C in the spindle formation and chromosome segregation 4....
EB - Genetika a molekulární biologie
- 2017 - 2021 •
- 7 519 tis. Kč •
- 6 461 tis. Kč •
- MŠMT
Řešení projektu: 1. 6. 2017 - 31. 12. 2021
Uznané náklady
Podpora ze státního rozpočtu (86%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
The signaling pathways synchronizing nuclear envelope break down, chromosome condensation a spindle formation during mammalian meiosis of oocytes (LH12057)
The main goal of the project is to characterize the functions and roles of indirect (AURKA and PLK1 signaling) and direct (CDC25A) regulators of CDK1 activity in the synchronization of processes such as nuclear envelope break down, chromosome condens...
EB - Genetika a molekulární biologie
- 2012 - 2015 •
- 5 449 tis. Kč •
- 3 491 tis. Kč •
- MŠMT
Řešení projektu: 1. 3. 2012 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (64%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Regulation of acentriolar spindle assembly and chromosome segregation in human and mouse oocyte meiosis (GA23-07532S)
structures called liquid-like spindle domains (LISD). The Aurora kinases (AURKs), a family of protein kinases, are considered critical regulators of spindle formation and congenital disorders. Meiotic spindle disr...
Cell biology
- 2023 - 2025 •
- 7 402 tis. Kč •
- 7 402 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Spindle units with condition monitoring (FW02020033)
The main goal of the project is the development of intelligent spindle units of the spindle units to independently control their operating condition and the state of the cutting process. Ie. the spindle units will be equipp...
Mechanical engineering
- 2020 - 2023 •
- 17 451 tis. Kč •
- 12 750 tis. Kč •
- TA ČR
Řešení projektu: 1. 9. 2020 - 31. 12. 2023
Uznané náklady
Podpora ze státního rozpočtu (73%)
Poskytovatel: Technologická agentura ČR
Design of a high-speed ring spindle using a digital twin (FW06010052)
The ELS40K project aims to develop a high-speed textile spindle using advanced ring spindle for spinning machines that will be operable at speeds up to 40,000 rpm. The project also aims to: - Create a digital twin of the spindl...
Applied mechanics
- 2023 - 2025 •
- 15 812 tis. Kč •
- 10 788 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (68%)
Poskytovatel: Technologická agentura ČR
*Milling ram for exchangeable milling heads with drilling spindle (FR-TI4/651)
*Milling ram for exchangeable milling heads with automatic exchange and with drill spindle with the travel of 800 mm. Milling ram with the drill spindle enables its implantation on the machine tool both in horizontal, as well vertic...
JQ - Strojní zařízení a nástroje
- 2012 - 2014 •
- 21 162 tis. Kč •
- 9 581 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2012 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (45%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Development of universal bed-type machining centre. (FI-IM2/034)
Development of bed-type universal machining centre with one spindle head continuously controlled in two rotary axes with possibility simple exchange of electric spindle behind mechanical spindle with maechanical drive to ma...
JQ - Strojní zařízení a nástroje
- 2005 - 2006 •
- 27 607 tis. Kč •
- 11 825 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2005 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (43%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Supervision system for HSC spindle with active magnetic bearings (GP101/05/P040)
The aim of the project is development of a supervision system for HSC spindle compensation; using of the bearing as an actuator for identification of spindle parameters and adaptation of spindle bearing parameters and cutti...
JQ - Strojní zařízení a nástroje
- 2005 - 2007 •
- 734 tis. Kč •
- 734 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2005 - 31. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
High-production spindle spinning unit. (FA-E2/018)
Development of a new spindle spinning technology and spinning unit enabling at least double delivery speed compared with existing ring spinning machines while varn quality remaining well-comparable with ring-spun yarn quality.......
JR - Ostatní strojírenství
- 1999 - 2001 •
- 37 754 tis. Kč •
- 18 200 tis. Kč •
- MPO
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (48%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Development of Six - Spindle Automatic Lathe SAY 6/67. (FA-E2/102)
Development of Six-Spindle Automatic Lathe with opening max 67 mm, with Cris-CNC-Support for shaping of accurate complicated form-parts in very short working times.......
JQ - Strojní zařízení a nástroje
- 1999 - 2002 •
- 13 053 tis. Kč •
- 5 000 tis. Kč •
- MPO
Řešení projektu: 1. 1. 1999 - 1. 1. 2002
Uznané náklady
Podpora ze státního rozpočtu (38%)
Poskytovatel: Ministerstvo průmyslu a obchodu
- 1 - 10 out of 2 491