All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

6 274 (0,452s)

Project

Wind-tunnel corrections of the measurement results at the high subsonic and low transonic speeds. (RP-3220/61)

Wind-tunnel corrections of the measurement results at the high subsonic and low transonic speeds....

JU - Aeronautika, aerodynamika, letadla

  • 1994 - 1999
  • 10 157 tis. Kč
  • 9 400 tis. Kč
  • MPO
Project

Wind Tunnels - renovation and operation (LM2011016)

on the modernization of the actual tunnel equipment and measuring technology. Modernization of the tunnels will bring the expansion of technical opportunities for wind measurements of the wind

BK - Mechanika tekutin

  • 2012 - 2016
  • 124 750 tis. Kč
  • 80 405 tis. Kč
  • MŠMT
Project

Wind tunnel modelling of wind effects on building structures and near field effects (GA103/96/1200)

a wind tunnel with a modelled boundary layer for simulation of wind effects. The substance of the proposed project is the simulation of a wind effects in the new tunnel-figuration and influence of existin...

JN - Stavebnictví

  • 1996 - 1998
  • 4 631 tis. Kč
  • 3 000 tis. Kč
  • GA ČR
Project

Reliability of local pressure measurements on models in boundary layer wind tunnel (GA103/03/1395)

By the simulation of effects of wind on the buildings in the tunnel notautomatically guarantee the sufficient accuracy of all measured values. The condition of the simulated measuring by full-scale data. It is poss...

JM - Inženýrské stavitelství

  • 2003 - 2005
  • 4 122 tis. Kč
  • 2 760 tis. Kč
  • GA ČR
Project

Wind Loads to Buildings and Assessment of Wind Convenience in Their Vicinity (GA103/06/1522)

, their damping and suppression of the tunnel structure vibrations. Both measurement results, and realization of the long-term monitoring for the building responses to the wind loads with the concurrent recording of the

JN - Stavebnictví

  • 2006 - 2008
  • 3 278 tis. Kč
  • 3 215 tis. Kč
  • GA ČR
Project

Atmospheric chemistry in fluence on upper troposphere - simulation in the wind tunnel (OC 723.001)

Atmospheric chemistry in fluence on upper troposphere - simulation in the wind tunnel...

DI - Znečištění a kontrola vzduchu

  • 2003 - 2006
  • 3 670 tis. Kč
  • 1 990 tis. Kč
  • MŠMT
Project

Wind-tunnel corrections of the measurement results at the high subsonic and low transonic speeds. (RP-3220/61/97)

JU - Aeronautika, aerodynamika, letadla

  • 1994 - 1999
  • 14 575 tis. Kč
  • 13 020 tis. Kč
  • MPO
Project

Temporal and spatial representativeness of the atmospheric boundary layer profiles (LTC20056)

in the wind tunnel. Temporal and spatial representativeness of the ABL profiles will be quantified by comparison of the field and wind-tunnel datasets. • Detection of coherent boundary layer profiles. ABL profile...

Meteorology and atmospheric sciences

  • 2020 - 2023
  • 5 927 tis. Kč
  • 5 927 tis. Kč
  • MŠMT
Project

Urban Air Pollution control model and in situ measurements (OC 715.50)

The purpose of the project is to measure the spatial and temporal concentration profiles of pollutants in the atmosphere on model objects under real conditions.The measurements carried out in a real atmosphere will be compared with ...

DI - Znečištění a kontrola vzduchu

  • 1999 - 2004
  • 4 544 tis. Kč
  • 2 010 tis. Kč
  • MŠMT
Project

Construction of Wind-Tunnel Arrangement for Model Tests of Wind Loading Effects on Buildings and Structures (GA103/93/0765)

JN - Stavebnictví

  • 1993 - 1995
  • 1 582 tis. Kč
  • 3 164 tis. Kč
  • GA ČR
  • 1 - 10 out of 6 274