All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

5 235 (0,108s)

Project

Green tunnel (TA01030020)

apparature proposal. The new optimized structure of safe tunnel system methodology will be projected. This will simplify the operator?s decision about keeping the tunnel safe. A tunnel laboratory...

JO - Pozemní dopravní systémy a zařízení

  • 2011 - 2013
  • 8 593 tis. Kč
  • 5 829 tis. Kč
  • TA ČR
Project

Road tunnel safety harmonization with the requirements of the Directive 2004/54/EC and road tunnel optimalization from safety aspects, abbr. SAFETUN (CG711-020-910)

The aim of the SAFETUN project is an implementation of requirements of the Directive 2004/54/EC to the Czech relationship for the tunnels of lengths up to 500 m and creation of environs for risk management and systematic training of tunn...

JO - Pozemní dopravní systémy a zařízení

  • 2007 - 2009
  • 4 040 tis. Kč
  • 3 422 tis. Kč
  • MD
Project

Experimental verification of the tunnel lining performance (GA103/05/2231)

be excluded. The tunnel design must be safe and satisfy stringent requirements on serviceability and durability. The tunnel design ís based on many parameters, whichTitle: Experimental verificadon of the tunnel li...

JM - Inženýrské stavitelství

  • 2005 - 2007
  • 3 840 tis. Kč
  • 3 840 tis. Kč
  • GA ČR
Project

Wind Tunnels - renovation and operation (LM2011016)

technical state of wind tunnels and safeguarding operations with emphasis on the quality idea of the project is to ensure funding for the renewal and operation on the modernization of the actual tunnel equipment a...

BK - Mechanika tekutin

  • 2012 - 2016
  • 124 750 tis. Kč
  • 80 405 tis. Kč
  • MŠMT
Project

Reliability Diagnostics of Technological Equipment (TH04010481)

information to support decision-making by the operator or tunnel manager. Implementing important part of total operating costs. By preventive maintenance or replacement and to reduce unintended failures that can lead to th...

Automation and control systems

  • 2019 - 2021
  • 5 697 tis. Kč
  • 3 415 tis. Kč
  • TA ČR
Project

Optimization of technological equipment of road tunnels with respect to safety and investment and operational cost (HADES) (TA03030491)

The project is focused on quantitative assessment of the risk in road tunnels. This means, for a specific tunnel and the proposed (or existing) facilities to calculate. Thereby it will be possible to change the equipment of the ...

JO - Pozemní dopravní systémy a zařízení

  • 2013 - 2015
  • 5 624 tis. Kč
  • 3 655 tis. Kč
  • TA ČR
Project

Technical support to harmonize the approach to the safety impronements of nuclear power plants with VVER type reactors (1P04LA219)

harmonisation of the approach to the safety impronements of nuclear power plants with VVER type reactors,safequarding of safe operation,upgrade and implementation of measures for enhancement of safe operation ,......

JF - Jaderná energetika

  • 2004 - 2007
  • 2 680 tis. Kč
  • 1 220 tis. Kč
  • MŠMT
Project

Centre for Effective and Sustainable Transport Infrastructure (CESTI) (TE01020168)

of structural, technological and management instruments for safe transport infrastructure and operation of transport infrastructure. C6 Cultivation of environment for broader of existing bridges. C9 Progressive designs, processes a...

JM - Inženýrské stavitelství

  • 2012 - 2019
  • 358 618 tis. Kč
  • 241 696 tis. Kč
  • TA ČR
Project

Development and application of numerical methods for increasing safety of the tunnel construction and operation. (TA01031840)

The primary aim of the research project is development of numerical methods for safer and more economical design of geotechnical structures, with the emphasis on the tunnels of traffic infrastructure. New consitutive model based on the theor...

JM - Inženýrské stavitelství

  • 2011 - 2013
  • 5 853 tis. Kč
  • 4 623 tis. Kč
  • TA ČR
Project

Tunnel lining reinforced with composite materials with increased durability and resistance (CK04000283)

intended for tunnel lining fully reinforced with GFRP reinf. This segment operating from the surrounding envir. and from the internal envir. caused by traffic for their interruption. Important aspect will be also the development of...

Construction engineering, Municipal and structural engineering

  • 2023 - 2026
  • 18 213 tis. Kč
  • 12 045 tis. Kč
  • TA ČR
  • 1 - 10 out of 5 235