All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

268 (0,135s)

Project

Research of coupled processes in rock environment and development of methodologies for long-term stability assessments of underground facilities (FR-TI3/579)

and long-term operation of underground gas storage reservoirs. The first part of theproject is focused on experiments performed to study the THM processes in Underground underground facility.......

DB - Geologie a mineralogie

  • 2011 - 2015
  • 34 203 tis. Kč
  • 23 951 tis. Kč
  • MPO
Project

Construction of underground structures in coherent urban area. (AACBU38-05)

Analysis of suitable methods of identification of caverns, old underground structures.Analysis of impact of vibrations connected with construction of underground structure mass and protection of buildings from impacts of undergr...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2007
  • 6 745 tis. Kč
  • 6 745 tis. Kč
  • ČBÚ
Project

Non-accelerator astroparticle physics in international underground laboratories (LA305)

enhancement of direct participation in non-accelerator astroparticle physics performed in international underground laboratories...

BN - Astronomie a nebeská mechanika, astrofyzika

  • 2007 - 2010
  • 4 280 tis. Kč
  • 4 280 tis. Kč
  • MŠMT
Project

Liquidation of underground mine by stowing after completion of mining activity for reduction of safety and ecological risks (AACBU42-05)

Analysis of mining regulations and other connected generally binding legal regulations related to underground mine liquidation and materials used at liquidation and ecological risks of underground mine liquidation by stowing, includ...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2007
  • 6 000 tis. Kč
  • 6 000 tis. Kč
  • ČBÚ
Project

Monitoring of underground objects in operation stage. (ABCBU61-08)

The project solves the monitoring absence of underground objects in operation stage. In term of safety of the underground construction it will be maked the methodology of the continual check on the state of permanent supporting stru...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2008 - 2010
  • 8 029 tis. Kč
  • 8 029 tis. Kč
  • ČBÚ
Project

Research and development of pumped-storage hydroelectric station in underground mine (FR-TI3/533)

in underground mine as an utilizable source of peak energy. The system of pumped-storage stations in underground mines can be realized because of a forced pumping of underground water to prevent flooding of active mines. T...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2011 - 2015
  • 79 015 tis. Kč
  • 52 373 tis. Kč
  • MPO
Project

Control and visualization of information of the technological process of the underground mine (GA105/98/0818)

tasks of underground technological processes, which will work in real time (on-line underground mine subsystems will be included. System will be designet to fitt all needings of any underground mine. System follows the ana...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 1998 - 1999
  • 553 tis. Kč
  • 465 tis. Kč
  • GA ČR
Project

Behaviour analysis of underground structures by means of mathematical and experimental simulation (GP103/07/P323)

Underground structures belong to structures whose decisive part is created by rock surroundings. Rock mass is not mostly homogeneous and isotropic surroundings of rock mass (discontinuities) on underground structures behaviour. Thei...

JN - Stavebnictví

  • 2007 - 2009
  • 747 tis. Kč
  • 747 tis. Kč
  • GA ČR
Project

*Research of the new anchor element with high share of strain energy for application in conditions of underground constructions. (FT-TA/088)

*Research of a new generation of hydraulically tensioned rock bolts for rock reinforcement around underground openings, characterized by considerable higher deformability. The aim of the project is to achieve a complete know-how......

JN - Stavebnictví

  • 2004 - 2005
  • 1 630 tis. Kč
  • 1 328 tis. Kč
  • MPO
Project

Project LSM/ULISSE ? contribution of the Czech Republic to the extension of the large research infrastructure of European importance (underground laboratory and construction of SuperNEMO experiment (LM2011027)

The main aim of the project is to support the Czech participation in the use and development of unique research infrastructure - underground laboratory LSM / ULISSE. The project will help sustain the existing technical equipment, support a c...

BG - Jaderná, atomová a molekulová fyzika, urychlovače

  • 2012 - 2015
  • 30 000 tis. Kč
  • 30 000 tis. Kč
  • MŠMT
  • 1 - 10 out of 268