All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

5 618 (0,153s)

Project

Road tunnel safety harmonization with the requirements of the Directive 2004/54/EC and road tunnel optimalization from safety aspects, abbr. SAFETUN (CG711-020-910)

The aim of the SAFETUN project is an implementation of requirements of the Directive 2004/54/EC to the Czech relationship for the tunnels of lengths up to 500 m and creation of environs for risk management and systematic training of...

JO - Pozemní dopravní systémy a zařízení

  • 2007 - 2009
  • 4 040 tis. Kč
  • 3 422 tis. Kč
  • MD
Project

Green tunnel (TA01030020)

will be projected. This will simplify the operator?s decision about keeping the tunnel safeDuring the project universal controlling system simulator for tunnel maintenance training will be created. There will be a...

JO - Pozemní dopravní systémy a zařízení

  • 2011 - 2013
  • 8 593 tis. Kč
  • 5 829 tis. Kč
  • TA ČR
Project

Wind Tunnels - renovation and operation (LM2011016)

technical state of wind tunnels and safeguarding operations with emphasis on the quality idea of the project is to ensure funding for the renewal and operation on the modernization of the actual tunnel equipment a...

BK - Mechanika tekutin

  • 2012 - 2016
  • 124 750 tis. Kč
  • 80 405 tis. Kč
  • MŠMT
Project

Reliability Diagnostics of Technological Equipment (TH04010481)

information to support decision-making by the operator or tunnel manager. Implementing important part of total operating costs. By preventive maintenance or replacement and to reduce unintended failures that can lead to th...

Automation and control systems

  • 2019 - 2021
  • 5 697 tis. Kč
  • 3 415 tis. Kč
  • TA ČR
Project

Optimization of technological equipment of road tunnels with respect to safety and investment and operational cost (HADES) (TA03030491)

The project is focused on quantitative assessment of the risk in road tunnels. This means, for a specific tunnel and the proposed (or existing) facilities to calculate. Thereby it will be possible to change the equipment of the ...

JO - Pozemní dopravní systémy a zařízení

  • 2013 - 2015
  • 5 624 tis. Kč
  • 3 655 tis. Kč
  • TA ČR
Project

Development and application of numerical methods for increasing safety of the tunnel construction and operation. (TA01031840)

The primary aim of the research project is development of numerical methods for safer and more economical design of geotechnical structures, with the emphasis on the tunnels of traffic infrastructure. New consitutive model based on the theor...

JM - Inženýrské stavitelství

  • 2011 - 2013
  • 5 853 tis. Kč
  • 4 623 tis. Kč
  • TA ČR
Project

Tunnel lining reinforced with composite materials with increased durability and resistance (CK04000283)

intended for tunnel lining fully reinforced with GFRP reinf. This segment operating from the surrounding envir. and from the internal envir. caused by traffic for their interruption. Important aspect will be also the development of...

Construction engineering, Municipal and structural engineering

  • 2023 - 2026
  • 18 213 tis. Kč
  • 12 045 tis. Kč
  • TA ČR
Project

Safety traffic barrier of road tunnels – SOFT STOP (TA04031111)

The objective is to design, build and test road tunnel barrier prototype. The barrier will ensure a more efficient closure of the road tunnel in case of emergency by testing, conformity with technical standards will be documented. <...

JO - Pozemní dopravní systémy a zařízení

  • 2014 - 2017
  • 26 611 tis. Kč
  • 16 668 tis. Kč
  • TA ČR
Project

Tools for reliable design and construction of tunnels in urban development with emphasis on safety and lifetime (TA01030245)

and construction of tunnels with emphasis on safety and lifetime. It will be achieved and operative interference with the course of construction in case of unexpected as a probable damage occuring both in the tunnel and in...

JM - Inženýrské stavitelství

  • 2011 - 2014
  • 13 269 tis. Kč
  • 10 560 tis. Kč
  • TA ČR
Project

Training of commanders and staff for recent types of operations (OFVRG20130002)

The aim of the project is to provide military units and staff with tactical training focused on current types of operations by utilization of OneSAF simulation system used at centers of the Czech Army.......

KA - Vojenství

  • 2013 - 2015
  • 9 186 tis. Kč
  • 9 186 tis. Kč
  • MO
  • 1 - 10 out of 5 618