Filters
The role of combination of fluxes, mineralizers and SCMs on properties of low-energy clinker (GA23-05122S)
Understanding the mechanisms of pre- and post-activation of low-energy clinker and the properties of clinker and cement and defines the relationship between pure clinker phases, model and industrial clinker. New fi...
Civil engineering
- 2023 - 2025 •
- 8 851 tis. Kč •
- 8 851 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
The influence of belite clinker formation kinetics on the hydraulic activity of belite cement (GA103/03/0064)
and kinetics of the belite clinker formation on its the hydraulic activity on thevelocity of clinker formation, which is the reason why belite in belite clinker is much more active than belite in alite-belite clinker
JN - Stavebnictví
- 2003 - 2005 •
- 4 930 tis. Kč •
- 3 496 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (71%)
Poskytovatel: Grantová agentura České republiky
The research on the combined effect of sulfur, copper and lithium oxides on the formation and properties of Portland cement clinker. (GA23-05082S)
and Li2O on the Portland clinker formation and to broaden the knowledge in the field composition, structure and properties of clinker. It is known that both Li and Cu have a positive effect on clinker burnability and negat...
Civil engineering
- 2023 - 2025 •
- 9 324 tis. Kč •
- 9 324 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
The influence of alite polymorphism on the properties of portland cement (GA103/98/0355)
of raw meals for burning of clinkers with different alite polymorph will be prepared regime or pre-heating the raw meal. The clinkers will serve for preparation of a set strength and hydration behaviour. In order to ensure objectiv...
JJ - Ostatní materiály
- 1998 - 2000 •
- 1 579 tis. Kč •
- 1 579 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Increasing the durability of concrete pavements of roads by limiting the effect of alkali-silica reaction (ASR) (TH04010207)
+) in ASR; -to find the type of binding of alkalis in the Portland clinker; -to find in the Portland clinker in the start moment and during the ASR; -to identifying the risk alkali forms in clinker and cement in terms o...
Construction engineering, Municipal and structural engineering
- 2019 - 2022 •
- 21 496 tis. Kč •
- 12 802 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2019 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Special cementitious binders for immobilization of toxic elements (GAP104/12/1494)
The project is focused on research of special binders for immobilization of toxic elements. The basic component of the binders for stabilization of inorganic contaminants containing wastes will be special clinkers with chosen minor element i...
JI - Kompositní materiály
- 2012 - 2015 •
- 6 018 tis. Kč •
- 6 018 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Development and application of cement to increase lifespan of concrete pavements and reduce of carbon footprint of transport structures (SS07020233)
The aim is to develop a cement made of high-belite clinker for transport structures. The project reflects the need to reduce CO2 emissions from clinker production and the sustainability of transport structures (TS). Suitable types o...
Construction engineering, Municipal and structural engineering
- 2024 - 2026 •
- 13 284 tis. Kč •
- 10 521 tis. Kč •
- TA ČR
Řešení projektu: 1. 4. 2024 - 30. 6. 2026
Uznané náklady
Podpora ze státního rozpočtu (79%)
Poskytovatel: Technologická agentura ČR
The research on the hydraulic activation possibilities of dicalciumsilicate by sulphate anions (GA103/09/0721)
The main of this project is to prepare the hydraulically active belite clinker - the main clinker formation, will be applied. SO3 brings about the delay of the alite clinker, furthermore it can cause complete blockage of al...
JN - Stavebnictví
- 2009 - 2011 •
- 3 757 tis. Kč •
- 3 757 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Research of phase composition and structure of refractory material based on portland clinker (GA103/95/0020)
JH - Keramika, žáruvzdorné materiály a skla
- 1995 - 1997 •
- 1 600 tis. Kč •
- 1 600 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1995 - 1. 1. 1997
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Effects of mechano-chemical activation on the process of formation, structure and stability of selected clinker minerals (GA20-00676S)
The project will be focused on studying how the effects of mechanical activation influence the formation and stability of alite and belite polymorphs. The investigation will focus on the influence of different activation technologies on pure isolate...
Materials engineering
- 2020 - 2022 •
- 4 505 tis. Kč •
- 4 505 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 31