All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

4 (0,108s)

Project

Wet buffing machine (TC5-013)

Substantiality of project is development, production and selling of wet buffing machines working lenght 1500 mm, 900 mm and 600 mm based on new technology - buffing of leathers in wet stage, which will be compentitive on world market 0 0......

JR - Ostatní strojírenství

  • 1999 - 2000
  • 20 235 tis. Kč
  • 8 000 tis. Kč
  • MH
Project

Utilization of slaughter-house collagen waste (GA104/96/0627)

from tanneries production will be applied to purification ev. degradation...

DM - Tuhý odpad a jeho kontrola, recyklace

  • 1996 - 1998
  • 1 110 tis. Kč
  • 950 tis. Kč
  • GA ČR
Project

Optimization of consumption water, electric power and heat in the processes in which raw hide is transformed into leather (8JCH1001)

water. • Ecologization od tannery production....

Chemical process engineering

  • 2019 - 2021
  • 298 tis. Kč
  • 298 tis. Kč
  • MŠMT
Project

Effect of irrigation and precipitation to arsenic mobility in soils (GAP210/10/0938)

Arsenic in soils originates either from the former acid deposition as an anthropogenic product (coal combustion, metallurgy, smelter and tannery industry, fertlizers, arsenic-based insecticides and pesticides), or from the weathering of sulf...

DD - Geochemie

  • 2010 - 2012
  • 2 864 tis. Kč
  • 2 864 tis. Kč
  • GA ČR
  • 1 - 4 out of 4