Filters
Research and Development Workout Outdoor and their Innovation into a Whole New Product Line (EG19_262/0020295)
The main goal of the project is industrial research and experimental development of a new workoutland product line. The output of research and development within the project will be 3 x prototypes of new indoor / outdoor training elements and 1 x pro...
Electrical and electronic engineering
- 2020 - 2023 •
- 11 278 tis. Kč •
- 0 tis. Kč •
- MPO
Řešení projektu: 15. 1. 2020 - 19. 9. 2023
Uznané náklady
Podpora ze státního rozpočtu (0%)
Poskytovatel: Ministerstvo průmyslu a obchodu
True condition of the ACR personnel from the health condition, physical and mental readiness point of view for the needs of combat engagement (MO21101299101)
Preparation and training optimization of military professionals for peacetime and combat engagement conditions through improvement of health, physical and mental condition.......
KA - Vojenství
- 1999 - 2001 •
- 2 300 tis. Kč •
- 2 300 tis. Kč •
- MO
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
Contrastive Description of Current Slovak and Czech Lexica (Systemic Relationships and Communicative Coexistence) (GAP406/11/2304)
The project focuses on research of current state of language relations between Czech and Slovak languages in the areas of lexicon and language behaviour of speakers in the environment of the other language.After collecting data and summarizing theore...
AI - Jazykověda
- 2011 - 2016 •
- 6 545 tis. Kč •
- 6 545 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2011 - 24. 11. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Controlled depostion compound and sandwiches thin films by vacuum reactive arc evaporation (GA106/96/0127)
will be to workout the depositions of binary nitride TiN and ZrN films directed towards precise...
JK - Koroze a povrchové úpravy materiálu
- 1996 - 1998 •
- 1 871 tis. Kč •
- 1 721 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1996 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (92%)
Poskytovatel: Grantová agentura České republiky
- 1 - 4 out of 4