All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

980 (0,072s)

Project

Digital automated monitoring of the synergic effects of flooding of closed mines in the Kladno coalfield to manage the risks of the consequences of mining activities and further area development (SS07020036)

of mines flooding after long term coal mining and intensive industrial activity to flooding and controlled pumping of mine water, and (iii) publicly accessible database automated monitoring of synergic ef...

Water resources

  • 2024 - 2026
  • 31 715 tis. Kč
  • 14 004 tis. Kč
  • TA ČR
Project

Non-Traditional Utilisation of Uranium Deposits after Underground Mining Completion (GA105/06/0127)

and also the achieved depth of mining. In the course of flooding the underground mine). Mine waters of flooded former uranium mines thus represent, with reference and that is drained from flo...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2006 - 2008
  • 3 897 tis. Kč
  • 3 897 tis. Kč
  • GA ČR
Project

Research of the gradual flooding of the Karviná part of OKR with the high salinity water on the enviroment country and the stability of the HDD (TITSCBU908)

Define the practical degree of threat to the country affected by coal mining by gradually lowering the underground - mining waters in the Karvina sub-district of OKR.......

Environmental sciences (social aspects to be 5.7)

  • 2020 - 2022
  • 8 343 tis. Kč
  • 8 343 tis. Kč
  • TA ČR
Project

Possibilities of main mining works liquidation by unconsolidated filling material (AACBU36-05)

, with special respect to additional liquidation of flooding shafts.Scientific knowledge methodical directions of Czech Mining Administration for the process of approval of shaft for redevelopment of flooding shafts.......

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2007
  • 4 046 tis. Kč
  • 4 046 tis. Kč
  • ČBÚ
Project

The reclamation of flooded mine subsidence and sedimentation reservoirs in the Upper Silesian Mining Landscape (GA105/06/1242)

The main goal of the project is to understand processes participating in the optimisation of remedial and reclaiming works in the mining landscape by using of post-mining damage. Results of the project will provide the knowledge of ...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2006 - 2008
  • 988 tis. Kč
  • 988 tis. Kč
  • GA ČR
Project

Exploration of Raw Material and Energy Use of the Potential of Mine Water in Flooded Uranium Mines (GA105/09/0808)

In the 90ies of the last century, dozens of underground uranium mines were closed and later spontaneously flooded.  More than 10 years after the end to considerable amountsof accumulated water in the mining space, relativel...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2009 - 2011
  • 4 941 tis. Kč
  • 4 941 tis. Kč
  • GA ČR
Project

Possibilities for mining the left reserves of the shut-down mines by non-traditional methods - the hydraulic borehole mining (GA105/97/0146)

The aim is to create a complete project that enables to mine the left coal reserves, other raw materials resp. from the underground of a shut-down mine using devices. It is not possible to mine such mine parts by t...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 1997 - 1999
  • 2 192 tis. Kč
  • 2 137 tis. Kč
  • GA ČR
Project

Aspect of the long-term sustainability of the restoration of the mining region Podkrušnohoří. (SL/640/9/03)

Verify the conceptions of restoration of the Podkrušnohorská Brázda/rift disturbed by mining, mainly the conception of creating the large flooded areas - the aspect of the long-term sustainability and diversity of the landscape.To p...

EH - Ekologie – společenstva

  • 2003 - 2005
  • 4 845 tis. Kč
  • 4 000 tis. Kč
  • MŽP
Project

The danger of inrush of water and raising water inflow from water - bearing clastics of Miocene age (detritus) into the active coal mines and its elimination (AACBU31-03)

to mining regulations issued by Czech mining authority in Prague and Ostrava.The mostly uncontrolled dewatering of the Miocene horizon during mining and the flooding of recently closed mines involved chan...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2003 - 2005
  • 5 819 tis. Kč
  • 5 819 tis. Kč
  • ČBÚ
Project

The renewal of the landscape, which is disabled of the long-term mining of the minerals and intensiv settlement (SM/8/101/05)

of the renewal the landscape in three circle: the mining of the browm coal, tiny mining, the geologic hazard, stability of the slopes, the ablations of the hazard of the floods.......

DO - Ochrana krajinných území

  • 2005 - 2007
  • 6 480 tis. Kč
  • 5 880 tis. Kč
  • MŽP
  • 1 - 10 out of 980