All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

472 (0,168s)

Project

Research and development of hydraulic telescopic shock absorbers of air suspension of axles controlled by air pressure. (FF-P2/007)

The main aim of the project is complex research, development, construction and verification of the prototype of the hydraulic telescopic shock absorber of air suspension of axles controlled by air pressure.......

JO - Pozemní dopravní systémy a zařízení

  • 2003 - 2005
  • 14 206 tis. Kč
  • 6 706 tis. Kč
  • MPO
Project

Damped Pressure and Flow Pulsation in the Hydraulic Circuits by Dynamic Shock-Absorber (GA101/93/0425)

JR - Ostatní strojírenství

  • 1993 - 1995
  • 120 tis. Kč
  • 240 tis. Kč
  • GA ČR
Project

Influence of surface modifications on the functionality of zinc-based absorbable materials for applications in bone reconstructions (GA23-05592S)

Zn-based alloys show properties suitable for the fabrication of absorbable implants. Despite this, the Zn-based absorbable materials are still not used of the surface treatment of a ZnMg0.8Sr0.2 absorbable alloy on its beha...

Materials engineering

  • 2023 - 2025
  • 10 961 tis. Kč
  • 10 688 tis. Kč
  • GA ČR
Project

A road system (EG17_173/0015893)

The aim of the project is a road restraint system with a high shock absorbing function. The proposer develops prototype (s) during the solution, verifies functions by simulated and real impact tests and prepares conditions for its p...

Mechanical engineering

  • 2019 - 2023
  • 12 672 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Generational innovation of methods for the vehicle damping testing (TA04031251)

manufacturers. The real condition of these examined shock absorbers will be accurately measured on special test rig which requires disassembly of the shock absorber......

JR - Ostatní strojírenství

  • 2014 - 2017
  • 4 820 tis. Kč
  • 3 116 tis. Kč
  • TA ČR
Project

Reliability of steel supports in (long) undenground openings under impact loading (GA105/04/0458)

load and is the basis for determination of the load. In case of earth shocks, the support in the affected mining working is loaded only dynamically by shocks and compare the supports for different deformation energy which the suppo...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2004 - 2006
  • 1 356 tis. Kč
  • 1 356 tis. Kč
  • GA ČR
Project

Research, development and manufacture of automatic parachute supply system for military and humanitarian purposes. (FI-IM4/022)

ofa transport truck including honeycomb shock absorbers....

JU - Aeronautika, aerodynamika, letadla

  • 2007 - 2009
  • 18 006 tis. Kč
  • 8 100 tis. Kč
  • MPO
Project

The development of new types of solar absorbers (TA04020456)

solar absorber, which suppresses the fundamental drawbacks of the existing solar absorbers. It is characterized by heat transfer by entire surface to the heat transfer medium of the absorber and its thermal efficiency will...

JJ - Ostatní materiály

  • 2014 - 2017
  • 20 068 tis. Kč
  • 13 021 tis. Kč
  • TA ČR
Project

Hydraulic semi-active damper for intelligent rail bogie (CK03000052)

The project aim is a development of constructional system of semiactive dampers enabling adaptation to demands on any damper in the intelligent rail bogie. S/A dampers enable damping force control which improves the function of the whole chassis. Thi...

Mechanical engineering

  • 2022 - 2025
  • 10 000 tis. Kč
  • 7 951 tis. Kč
  • TA ČR
Project

Research and development of a system for fixing sound absorbers for robotic assembly in automotive (EG21_374/0027255)

The aim of the project is the research of materials, or combinations of materials, as a suitable adhesive for application between polyethylene (PET) sound absorber and polypropylene (PP) fairing when applying the absorber to the fai...

Materials engineering

  • 2021 - 2024
  • 9 980 tis. Kč
  • 0 tis. Kč
  • MPO
  • 1 - 10 out of 472