Filters
Deformation mechanisms of geomaterials (IAA2111301)
the final grading curve. Deformation by diffusion and its decisive factors...
JM - Inženýrské stavitelství
- 2003 - 2005 •
- 1 303 tis. Kč •
- 747 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (57%)
Poskytovatel: Akademie věd České republiky
Application of black box modelling to calculation of limiting curves of circuit breakers SF6 and verification of these parameters (GA102/96/1701)
JA - Elektronika a optoelektronika, elektrotechnika
- 1996 - 1997 •
- 330 tis. Kč •
- 330 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1996 - 1. 1. 1997
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Analysis of physical and chemical characteristics of cementitious composites with recycled aggregates and dispersed polymer fibre reinforcement (GA14-17636S)
. The uniqueness of the design of this composite is to use wide grading curve of recycled aggregates only with limiting the maximum aggregate size, which increases......
JN - Stavebnictví
- 2014 - 2016 •
- 4 042 tis. Kč •
- 4 042 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2014 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Optimalization of the Temperature and Strain-Rate Conditions of Deformation of Selected Steel Grades to Rise the Workability Limits (GA101/93/0133)
JG - Hutnictví, kovové materiály
- 1993 - 1995 •
- 249 tis. Kč •
- 498 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1995
Uznané náklady
Podpora ze státního rozpočtu (200%)
Poskytovatel: Grantová agentura České republiky
The Grade Crossing in the Transport System of the Czech Republic (1F82A/032/130)
and limiting factors of a grade crossing into regional transport system which hasThe project concerns comprehensive solution of grade crossing problems and its contains technical and technological possibilities of improvin...
JO - Pozemní dopravní systémy a zařízení
- 2008 - 2009 •
- 6 868 tis. Kč •
- 6 640 tis. Kč •
- MD
Řešení projektu: 1. 2. 2008 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (97%)
Poskytovatel: Ministerstvo dopravy
Complex morphological, immunohistochemical, molecular genetic and clinico-pathological analysis of rare types of ovarian carcinomas (NV19-03-00007)
Most (about 70%) malignant epithelial ovarian tumors are high grade serous (approximately 10% each), followed by low grade serous (<5%) and mucinous carcinomas (<3 of tumor microenvironment, is limited. This is due to their...
Pathology
- 2019 - 2022 •
- 19 091 tis. Kč •
- 19 091 tis. Kč •
- MZ
Řešení projektu: 1. 5. 2019 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo zdravotnictví
Examining and improving security of elliptic curve cryptography (GA20-03426S)
Elliptic curve cryptography (ECC) became a prominent keystone in many security systems. Yet many unclear issues about ECC remain. Firstly, we will analyse ECC from theoretical and experimental viewpoints, focusing on elliptic curve ...
Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
- 2020 - 2022 •
- 6 969 tis. Kč •
- 5 960 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (86%)
Poskytovatel: Grantová agentura České republiky
Optimization of fine graded particles in concrete to obtain a High Performance Concretes (FV20019)
The goal of the project is to develop concretes with special use properties and their formulas, to which will be given utility models. Under this we understand concretes with specific physic-mechanical characteristics that are needed especially becau...
JN - Stavebnictví
- 2017 - 2020 •
- 4 487 tis. Kč •
- 2 592 tis. Kč •
- MPO
Řešení projektu: 1. 7. 2017 - 31. 12. 2020
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Ministerstvo průmyslu a obchodu
The fatigue life of thin-walled bridge structures and similar systems subjected to repeated loading (IAA200710603)
of the limit states that determine the design of bridge structures, i.e. for (i) the fatigue limit state of the structure and (ii) its serviceability limit state.......
JM - Inženýrské stavitelství
- 2006 - 2008 •
- 951 tis. Kč •
- 951 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2006 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Akademie věd České republiky
Physiological basis for covariations in light-limited and light-saturated photosynthesis in phytoplankton (GA206/05/0335)
The photosynthesis-irradiance (PE) relationship links indices of phytoplankton biomass (e.g., chlorophyll) to rates of primary production. The PE curve can be characterized by two variables: the light-limited slope (ab) and the ligh...
EE - Mikrobiologie, virologie
- 2005 - 2007 •
- 2 020 tis. Kč •
- 2 020 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2005 - 31. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 3 268