Filters
Inspection and Lifetime Assessment Tool for Arch Structures (7D10002)
Historical and even new arch bridges all over Europe supporting road and railway structures are not designed for currently required EN-load combinations. The objective of this project is the development of a monitoring and numerical based re...
JM - Inženýrské stavitelství
- 2010 - 2012 •
- 3 746 tis. Kč •
- 1 873 tis. Kč •
- MŠMT
Řešení projektu: 1. 1. 2010 - 31. 12. 2012
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Tools for the preservation of historical values and functions of arch and vaulted bridges (DG20P02OVV001)
and preservation methods of the masonry arch and concrete arch bridges. For the road administrators, it will provide a guide to determining the load rating of the masonry arch and structure history and value of masonry
Construction engineering, Municipal and structural engineering
- 2020 - 2022 •
- 9 178 tis. Kč •
- 9 178 tis. Kč •
- MK
Řešení projektu: 1. 3. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo kultury
Three-dimensional imaging and geometric morphometric approaches in the study of the post-operative development of the dental arch and palate in clefts. (NS10560)
Developing method of objective evaluation of shape-changes of the dental arch and palate in a single patient by means of a superposition of 3D computer models and shape of the dental arch and palate. A three-dimensional analysis of ...
FP - Ostatní lékařské obory
- 2009 - 2011 •
- 980 tis. Kč •
- 950 tis. Kč •
- MZ
Řešení projektu: 1. 1. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (97%)
Poskytovatel: Ministerstvo zdravotnictví
Load rating time prediction and life time of masonry arch bridges (1F82C/001/910)
Load rating assessment of masonry arch bridges in the Czech Republic is updated and suppplemented by its degradation and life time prediction. The update stems from detailed non-linear structural analyses of the population sample of czech br...
JM - Inženýrské stavitelství
- 2008 - 2009 •
- 1 970 tis. Kč •
- 1 970 tis. Kč •
- MD
Řešení projektu: 1. 2. 2008 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo dopravy
Development and research of straight and arched steel pipes lined with eccentric corundobaddeleyite segments (EG17_176/0015436)
The aim of the project is the development and construction of pipelines for pneumatic and hydraulic transport of abrasive materials with an emphasis on extending the service life of its arched parts, thus significantly increasing the competi...
Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)
- 2018 - 2023 •
- 19 555 tis. Kč •
- 0 tis. Kč •
- MPO
Řešení projektu: 12. 12. 2018 - 2. 6. 2023
Uznané náklady
Podpora ze státního rozpočtu (0%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Space structures supported by cables and/or arches (TA02011322)
The aim of the project is to develop light and transparent space structures of bridges and roofs that are supported by arches and/or cables. The structures are assembled of members from high performance material. They will be developed on th...
JM - Inženýrské stavitelství
- 2012 - 2014 •
- 4 834 tis. Kč •
- 2 909 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Load capacity assessment of masonry arch bridges (1F55A/005/120)
Basic idea of the project resides in the development of a method for load capacity assessment of masonry arch bridges applicable in mass scalei for structural engineers without special knowledge. Besides existing assessment methods abroad pa...
JM - Inženýrské stavitelství
- 2005 - 2007 •
- 2 880 tis. Kč •
- 2 880 tis. Kč •
- MD
Řešení projektu: 1. 1. 2005 - 1. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo dopravy
The Hillfort of Staré Zámky at Brno-Líšeň in the Early Middle Ages. Arch. and Hist. Evaluation of Investigations. (IAA9001502)
AB - Dějiny
- 1995 - 1996 •
- 129 tis. Kč •
- 129 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 1995 - 1. 1. 1996
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Akademie věd České republiky
Primary correction of interruption of the aortic arch at newborn age. (IZ2905)
FA - Kardiovaskulární nemoci včetně kardiochirurgie
- 1995 - 1997 •
- 529 tis. Kč •
- 529 tis. Kč •
- MZ
Řešení projektu: 1. 1. 1995 - 1. 1. 1997
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo zdravotnictví
Mandibular arch morphogenesis and embryological origin of jaws what does "maxillary" and "mandibular" really mean in the context of facial developmen (KJB5111403)
in the axolotl represents a primitive or a derived character state of gnathostome first arch...
EG - Zoologie
- 2004 - 2006 •
- 908 tis. Kč •
- 908 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2004 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Akademie věd České republiky
- 1 - 10 out of 42