All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

541 (0,083s)

Project

Stability analysis of cable stayed and suspension bridges (GA103/08/1700)

Suspension and cable stayed bridges are frequent in civil engineering. Their advantages are the easy erection and economic efficiency. On the other hand of this project isto formulate complex models of cable stayed and susp...

JM - Inženýrské stavitelství

  • 2008 - 2010
  • 888 tis. Kč
  • 888 tis. Kč
  • GA ČR
Project

Development of structural forms using stress - ribbon type decks strengthened by external cables or arches (GA103/96/1635)

The Principal Investigators were resposible for the development of bridge prestressing cables that are anchored into the abutments. In the design of the Lake Vranov Bridge, a stress-ribbon deck was erected in the shape of a...

JN - Stavebnictví

  • 1996 - 1998
  • 3 485 tis. Kč
  • 3 017 tis. Kč
  • GA ČR
Project

Space structures supported by cables and/or arches (TA02011322)

The aim of the project is to develop light and transparent space structures of bridges and roofs that are supported by arches and/or cables. The structures are assembled of members from high performance material. They will be develo...

JM - Inženýrské stavitelství

  • 2012 - 2014
  • 4 834 tis. Kč
  • 2 909 tis. Kč
  • TA ČR
Project

Vehicle scanning-based structure monitoring for cable supported bridges (GC21-32122J)

of cable-supported bridges with special attention to their typical service problems.The aim of the joint research project is to contribute to bridge health techniques having the potential to provide the bridge own...

Civil engineering

  • 2021 - 2023
  • 5 812 tis. Kč
  • 5 812 tis. Kč
  • GA ČR
Project

Modern method for axial forces measuring in elements of civil engineering structures (TA04030307)

Tensile steel cables and prestressed steel bars of prestressed concrete bridges, cables of cable stayed bridges, suspension bridge suspenders, arch bridge hangers, suspending cables

JM - Inženýrské stavitelství

  • 2014 - 2017
  • 7 028 tis. Kč
  • 4 370 tis. Kč
  • TA ČR
Project

Ekological and aesthetic composite bridge structures. (FD-K/092)

structures for bridges of long spans by taking an advantage of post-tensioning by external cables situated inside or outside of the cross section.......

JN - Stavebnictví

  • 2001 - 2003
  • 10 664 tis. Kč
  • 5 331 tis. Kč
  • MPO
Project

Light-weight concrete and its application in bridges (GA103/03/0952)

Light-weight concrete and its application in bridges. The first part includes a study which will show the possibilities of application of light-weight concrete in specified types of bridges. The bridges cast by free cantile...

JM - Inženýrské stavitelství

  • 2003 - 2005
  • 3 566 tis. Kč
  • 3 266 tis. Kč
  • GA ČR
Project

Development of optical cables for use in special applications and in extreme conditions (TK05020031)

The aim of the project is to implement two prototypes of optical cables (PRO1 and PRO2) and two proven production technologies for these optical cables (OVT1 and OVT2). The project results in completely new optical cable de...

Nuclear related engineering; (nuclear physics to be 1.3);

  • 2023 - 2025
  • 17 871 tis. Kč
  • 10 635 tis. Kč
  • TA ČR
Project

Forest Cable Yarder Larix Hydro. (FA-E2/007)

Research, development and production cable system Larix Hydro with aim to increased export of cable systems in 2001 - 2004 years....

JR - Ostatní strojírenství

  • 1999 - 2001
  • 7 644 tis. Kč
  • 2 995 tis. Kč
  • MPO
Project

Energetic cable with added sensors to measure working parameters along the cable length on IoT principle to optimize transferred power and energetic loses (TK03020196)

The main target is to add to energy cable ability to communicate of the cable, i.e. inner temperature, vibration level, etc. Particular targets are: 1 to integrate ot to the cable construction 2. Apply suitable technologie...

Energy and fuels

  • 2020 - 2022
  • 16 622 tis. Kč
  • 9 898 tis. Kč
  • TA ČR
  • 1 - 10 out of 541