All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

438 (0,097s)

Project

Hydrogen Oriented Underground Coal Gasification for Europe (7C08033)

The project explores the technology for hydrogen production through underground gasification of coal in a dynamic geo-reactor. The process will be controlled through. Theproject addresses CBM usage and CO2 sequestration in coal<...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2008 - 2010
  • 1 672 tis. Kč
  • 1 672 tis. Kč
  • MŠMT
Project

Advanced concepts and process schemes for CO2 free fluidised and entrained bed co-gasification of coals (7C11009)

fuels to energy conversion. The project aims at integrating gasification schemes for the co-gasification of coal, biomass and wastes with processes for CO2 separation and capture. Fluidised bed and entrained flow gasif...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2011 - 2013
  • 4 075 tis. Kč
  • 4 075 tis. Kč
  • MŠMT
Project

Hydrogen Oriented Underground Coal Gasification for Europe - Environmental and Safety Aspects (7C12017)

The project is focused on environmental and safety aspects of underground coal gasification. Underground trial will be performen in mine testing two borehole system and reactive barriers usage. The work will be focused on finding pr...

CI - Průmyslová chemie a chemické inženýrství

  • 2012 - 2014
  • 7 499 tis. Kč
  • 3 000 tis. Kč
  • MŠMT
Project

Near zero emission advanced fluidised bed gasification (7C08034)

gasification and its use to process biomass/waste together with coal and the technologyThe developments of fluidised bed gasification technologies stopped at pilot/demonstration scale for economic reasons but it grow the i...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2008 - 2010
  • 1 924 tis. Kč
  • 1 924 tis. Kč
  • MŠMT
Project

Study of IGCC for brown coals focusing on optimum pressure conditions in gas and steam turbines (GA101/02/0583)

cycle plants with coal gasification can meet efficiency of about 45% and the highestBrown coal from the northern Bohemia is used in electric power generation are in preparation. In the design of "Integrated gasificatio...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2002 - 2004
  • 3 075 tis. Kč
  • 2 616 tis. Kč
  • GA ČR
Project

Cleaning of syngas from from fluidized-bed gasification of coal-biomass blends for advanced power generation (GC14-09692J)

The research is aimed at study and solution of problems (thermodynamic constraints, reactivity, capacity and deactivation of the sorbents, textural changes, interferences of HCl) in removal of sulfur compounds from fuel gas (gasification of ...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2014 - 2016
  • 3 249 tis. Kč
  • 3 249 tis. Kč
  • GA ČR
Project

High Temperature Corrosion of Steels, Alloys and Coatings in Waste Incineration and Coal Gasification Plants (OC 522.30)

estimation of metallic parts in real conditions in waste incineators and/or coal gasification reactors in Czech Republic. Up to now,alloy steels and alloys have been tested......

JE - Nejaderná energetika, spotřeba a užití energie

  • 1998 - 2003
  • 4 529 tis. Kč
  • 1 595 tis. Kč
  • MŠMT
Project

Biomass gasification for cogeneration. (FT-TA2/061)

This project solves the way of biomass gasification for cogeneration....

JE - Nejaderná energetika, spotřeba a užití energie

  • 2005 - 2009
  • 39 438 tis. Kč
  • 26 030 tis. Kč
  • MPO
Project

*Development and research of gasification of wood waste in the form of wood chip (FR-TI1/219)

*The project concentrates on research and development of gasification of wood waste in the form of wood chip and on the construction of gasification unit of minor output for the needs of decentralized power engineering......

JE - Nejaderná energetika, spotřeba a užití energie

  • 2009 - 2012
  • 29 340 tis. Kč
  • 23 293 tis. Kč
  • MPO
Project

Combined heat and power production with gasification of biomass. (FT-TA3/122)

The project solves the way of biomass gasification for cogeneration....

JE - Nejaderná energetika, spotřeba a užití energie

  • 2006 - 2010
  • 38 444 tis. Kč
  • 25 650 tis. Kč
  • MPO
  • 1 - 10 out of 438