Filters
Show more
Show more
Show more
Show more
Show more
Show more
More filters
Projects
True condition of the ACR personnel from the health condition, physical and mental readiness point of view for the needs of combat engagement (MO21101299101)
Preparation and training optimization of military professionals for peacetime and combat engagement conditions through improvement of health, physical and mental condition.......
KA - Vojenství
- 1999 - 2001 •
- 2 300 tis. Kč •
- 2 300 tis. Kč •
- MO
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
The combat stress - impacts on soldiers of the ACR in conditions foreign missions (OSUVN20090004)
Understanding and the early prediction of the risk factors leasing to the later complications development will enable the utilisation of preventive procedures aimed to prevent such developement or redukce its seriousness.......
KA - Vojenství
- 2009 - 2011 •
- 4 652 tis. Kč •
- 4 652 tis. Kč •
- MO
Řešení projektu: 1. 5. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
POOZ - Mine clearance equipment (ORVTUPV200701)
The aim of the project is development of ?Mine clearance equipment - POOZ? for BVP-2, modernized T-72 and new KOT. It is intended to making full passageways through anti-tank mine-fields (mined area) by scatter mining on the road to move ability of m...
KA - Vojenství
- 2007 - 2008 •
- 3 889 tis. Kč •
- 3 889 tis. Kč •
- MO
Řešení projektu: 1. 8. 2007 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
Proposal for replacement of KAB 2A insuffient storage batteries insuring RS - 2 - US guidet rocket service (MO83051099127)
Resolving of replacement and creation of conditions for production of storage battery, which are not commonly accessable for aviation technics and on which the combat capability of aviation technics is dependent......
KA - Vojenství
- 1999 - 2001 •
- 1 200 tis. Kč •
- 1 100 tis. Kč •
- MO
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (92%)
Poskytovatel: Ministerstvo obrany
Strengthening the physical and mental resilience of soldiers for combat operations deployment (OYUOB20240006)
The research project aimed at enhancing soldiers' resilience to stress in combat conditions employs multidisciplinary approaches. The first phase involves a systematic exploration of available methods, emphasizing their effectivenes...
Other medical science
- 2024 - 2026 •
- 3 388 tis. Kč •
- 3 388 tis. Kč •
- MO
Řešení projektu: 4. 4. 2024 - 31. 12. 2026
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
*Development of SOM system into severe climatic conditions (SOM-2) (ORVTUVM200501)
*Is to increase efficiency of SOM deployment in foreign combat missions, which will enable an easy integration of SOM system to Emergency Action Unit for the option of immediate deployment during short time not only in the Czech republic but...
KA - Vojenství
- 2005 - 2006 •
- 18 746 tis. Kč •
- 18 746 tis. Kč •
- MO
Řešení projektu: 1. 1. 2005 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
Combat rations for extreme climatic conditions (OFMEDIAP20111)
The aim of the research is to develop and test the Combat rations (BDP-T), with long shelf life for troops operating in tropical and subtropical climate, where hygienic requirements for transport and storage without refrigeration must be met...
KA - Vojenství
- 2011 - 2013 •
- 4 906 tis. Kč •
- 4 906 tis. Kč •
- MO
Řešení projektu: 1. 4. 2011 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
KOLA - Combat use of wheeled armoured vehicles (carriers) in combat and special versions (OKV-B and OTK-S) in military and non-military operations. (OBVTUPV200301)
Analytical study that evaluates, elaborates and gives reasons for principles of combat use of wheeled armoured vehicles in combat and special versions in accordance with "The Concept of Development of the Professional Army of the Cz...
KA - Vojenství
- 2003 - 2003 •
- 1 299 tis. Kč •
- 1 299 tis. Kč •
- MO
Řešení projektu: 1. 1. 2003 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
DIGIBOJ - Integration of combat support to the digitized battlefield - 4D (OFVOPCZ201301)
The basic aim of the research is the analysis of the work of the commanders, staffs, as well as the warriors on the battlefield, which will contribute to the solution of the gradual integration of tha combat units, combat support el...
KA - Vojenství
- 2013 - 2015 •
- 4 965 tis. Kč •
- 4 965 tis. Kč •
- MO
Řešení projektu: 5. 7. 2013 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
Transparent armour for combat vehicles (OFVVU20140001)
1) Determination of lifetime of transparent armours in standard and extreme conditions of use (analysis of transparent armours used in ACR, assessment in terms the lifetime of transparent armours during operation and determination of the
JH - Keramika, žáruvzdorné materiály a skla
- 2014 - 2016 •
- 14 830 tis. Kč •
- 14 830 tis. Kč •
- MO
Řešení projektu: 1. 1. 2014 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo obrany
- 1 - 10 out of 6 593