Project

Development of predictive diagnostic system for equipments of electrical substations (TK04020068)

The main goal of the project is to create the optimal system with sensors, power supply and communication system, which will be used for signaling faults in electrical substations and their diagnostics with a focus on MV cables. The research...

Energy and fuels

  • 2022 - 2025
  • 30 915 tis. Kč
  • 18 544 tis. Kč
  • TA ČR
Project

Improving Reliability and Safety of Electrical Networks. (2A-2TP1/051)

providing the complete information on the service condition of HV and UHV components. This will be enhanced by the application of the new progressive technologies and the layout of HV evaluation system and optimizing the maintenanc...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2007 - 2011
  • 45 734 tis. Kč
  • 19 030 tis. Kč
  • MPO
Project

Development of optical cables for use in special applications and in extreme conditions (TK05020031)

The aim of the project is to implement two prototypes of optical cables (PRO1 and PRO2) and two proven production technologies for these optical cables (OVT1 and OVT2). The project results in completely new optical cable de...

Nuclear related engineering; (nuclear physics to be 1.3);

  • 2023 - 2025
  • 17 871 tis. Kč
  • 10 635 tis. Kč
  • TA ČR
Project

Forest Cable Yarder Larix Hydro. (FA-E2/007)

Research, development and production cable system Larix Hydro with aim to increased export of cable systems in 2001 - 2004 years....

JR - Ostatní strojírenství

  • 1999 - 2001
  • 7 644 tis. Kč
  • 2 995 tis. Kč
  • MPO
Project

Energetic cable with added sensors to measure working parameters along the cable length on IoT principle to optimize transferred power and energetic loses (TK03020196)

The main target is to add to energy cable ability to communicate of the cable, i.e. inner temperature, vibration level, etc. Particular targets are: 1 to integrate ot to the cable construction 2. Apply suitable technologie...

Energy and fuels

  • 2020 - 2022
  • 16 622 tis. Kč
  • 9 898 tis. Kč
  • TA ČR
Project

Stability analysis of cable stayed and suspension bridges (GA103/08/1700)

Suspension and cable stayed bridges are frequent in civil engineering. Their advantages are the easy erection and economic efficiency. On the other hand of this project isto formulate complex models of cable stayed and suspension br...

JM - Inženýrské stavitelství

  • 2008 - 2010
  • 888 tis. Kč
  • 888 tis. Kč
  • GA ČR
Project

Examination of methods of evaluating the reliability of electric high-voltage switch gears (GA102/99/1158)

with methods of reliability calculations of HV energy systems, their comparison and reliability models for particular types of HV networks. What is also a subject of solving of introduction of reliable components into the managemen...

JE - Nejaderná energetika, spotřeba a užití energie

  • 1999 - 2001
  • 475 tis. Kč
  • 475 tis. Kč
  • GA ČR
Project

Power distribution cables with integrated cooling and heat distribution system for energy recovery (TK05020190)

(multifunctional) low voltage cable up to 1000 V for electric power distribution. This means, for example, using the waste heat of the cable and at the same time the ground heat as a heat pump source. The optimal design of the hybr...

Energy and fuels

  • 2023 - 2025
  • 10 223 tis. Kč
  • 6 099 tis. Kč
  • TA ČR
Project

Current clamp for HV networks with wireless communication (TQ03000130)

The main goal is to create an innovative system for measuring electrical quantities in high voltage (HV) power systems. The designed system will enable wireless measurement of electric current and overcurrent on HV lines. Wireless c...

Communication engineering and systems

  • 2024 - 2025
  • 5 764 tis. Kč
  • 4 843 tis. Kč
  • TA ČR
Project

Safety of optical transport network and development of optical components for energy grid and energy transport systems (TA03020439)

and cables. One goal from many others is the temperature distribution monitoring inside of power cables together with position specification of the temperature profile fibers and cables during their loading with high optic...

AQ - Bezpečnost a ochrana zdraví, člověk – stroj

  • 2013 - 2016
  • 56 000 tis. Kč
  • 36 000 tis. Kč
  • TA ČR