Filters
Recent geodynamics of West Bohemia to the crustal structure (unique natural laboratory) (GA205/99/0907)
advantage oprevious results obtained within the KTB-related project 'Geological model of Western Bohemia in relation to the deep borehole KTB in the FRG' as well as within......
DC - Seismologie, vulkanologie a struktura Země
- 1999 - 2001 •
- 8 374 tis. Kč •
- 6 500 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (78%)
Poskytovatel: Grantová agentura České republiky
Positioning the zircon fission-track and micro-Raman partial annealing zones keys for thermochronology and the understanding of zircon material-properties and hydrocarbon maturity (EF19_074/0014756)
The project serves four distinct but related research objectives: 1) positioning the geological zircon fission track partial annealing zone, 2) positioning the zircon (Raman) radiation damage partial annealing zone, 3) understanding radiation dama...
Geology
- 2020 - 2022 •
- 3 515 tis. Kč •
- 530 tis. Kč •
- MŠMT
Řešení projektu: 1. 1. 2020 - 31. 10. 2022
Uznané náklady
Podpora ze státního rozpočtu (15%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Modelling of Magnetic Anisotropy of Rocks Under Stress Conditions of the KTB Drill and Investigation of Anisotropy Carriers (GA205/93/0414)
DB - Geologie a mineralogie
- 1993 - 1995 •
- 105 tis. Kč •
- 210 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1995
Uznané náklady
Podpora ze státního rozpočtu (200%)
Poskytovatel: Grantová agentura České republiky
Non-double-couple mechanisms through induced seismicity to fluid-driven earthquakes (GAP210/10/1728)
induced by injection in the KTB borehole, Germany, and by filling the underground gas...
DC - Seismologie, vulkanologie a struktura Země
- 2010 - 2013 •
- 2 329 tis. Kč •
- 2 329 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2010 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Integrated bentonite sealing for prevention of negative effect of hydrogelogical wells on underground water (TH02030622)
The original seal enabling its installation between borehole casing and borehole wall (annulus) will be developed and tested for its functional properties of the borehole. It will be possible to install it below the water t...
DJ - Znečištění a kontrola vody
- 2017 - 2020 •
- 11 495 tis. Kč •
- 7 889 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2017 - 30. 6. 2020
Uznané náklady
Podpora ze státního rozpočtu (69%)
Poskytovatel: Technologická agentura ČR
Hydraulic parameters of fractured rocks determined by logging from parameters of water flow in individual boreholes and between boreholes (GA205/07/0777)
vertical flow studies in a pair or in a group of boreholes or monitoring wells in the following steps: In the selected couple of boreholes (test area of the Czech Geological Survey) logs identifying the existence of fractured zones...
DA - Hydrologie a limnologie
- 2007 - 2009 •
- 1 716 tis. Kč •
- 1 716 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Geothermal research of the Chicxulub impact structure (GA205/03/0997)
, the drilling of the cored borehole Yaxcopoil-1 to the depth of 1.5 km was finished of the existing older boreholes in the region to the depths of 400-800 m by the logging tool variations in the successfully logged older boreho...
DC - Seismologie, vulkanologie a struktura Země
- 2003 - 2005 •
- 2 797 tis. Kč •
- 1 048 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (37%)
Poskytovatel: Grantová agentura České republiky
Climate changes in the past derived from boreholes temperature inversion and correlation with meteorolog. data (IAA3012706)
by mathematical inversion of the thermal log of selected boreholes and to corelate transformation of the borehole temperatures to climate. At the end a group of standars ground situations should be created. As a model locality we s...
DB - Geologie a mineralogie
- 1997 - 1999 •
- 1 103 tis. Kč •
- 285 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1999
Uznané náklady
Podpora ze státního rozpočtu (26%)
Poskytovatel: Akademie věd České republiky
USOR - Ultrasonic well rehabilitation and water treatment (LTE121007)
rehabilitation of water-supply boreholes based on the principle of ultrasonic wave emission-supply boreholes will be researched along with, in subsequent stage, the potential research on water-supply borehole regeneration ...
Water resources
- 2021 - 2023 •
- 7 436 tis. Kč •
- 3 718 tis. Kč •
- MŠMT
Řešení projektu: 1. 7. 2021 - 31. 12. 2023
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Climate Change in Europe Inferred from Borehole Temperatures (GA205/93/0413)
DC - Seismologie, vulkanologie a struktura Země
- 1993 - 1995 •
- 392 tis. Kč •
- 784 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1995
Uznané náklady
Podpora ze státního rozpočtu (200%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 63