All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

-
19852030

Join usingOrAnd

Join usingOrAnd

SelectAll/None
    • Show more

    • Show more

    • Show more

    • Show more

  • Show more

SelectAll/None

Join usingOrAnd

-

More filters

Projects

710 projects (0,07s)

Project

POOZ - Mine clearance equipment (ORVTUPV200701)

The aim of the project is development of ?Mine clearance equipment - POOZ? for BVP-2, modernized T-72 and new KOT. It is intended to making full passageways through anti-tank mine-fields (mined area) by scatter mining

KA - Vojenství

  • 2007 - 2008
  • 3 889 tis. Kč
  • 3 889 tis. Kč
  • MO
Project

Liquidation of underground mine by stowing after completion of mining activity for reduction of safety and ecological risks (AACBU42-05)

Analysis of mining regulations and other connected generally binding legal regulations related to underground mine liquidation and materials used at liquidation by stowing.Analysis of mine liquidation technology by stowing ...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2007
  • 6 000 tis. Kč
  • 6 000 tis. Kč
  • ČBÚ
Project

Research on innovative methods of mining stocks bound in coal mines (TB030CBU001)

. conditions, b) in conditions of reverse slopes of brown coal open mines - concentrated on optimization of mining horizons as also maximization of the reserves utilization, 2. Technological and technical solutions of coal mine<...

JG - Hutnictví, kovové materiály

  • 2015 - 2016
  • 5 500 tis. Kč
  • 5 500 tis. Kč
  • TA ČR
Project

Mine clearing equipment (MO03041100001)

Technical solution of special mechanical mine clearing equipment shifting away mines optimised with use of ANSYS LS-DYNA finite element computing method as a part of equipment for mine fields passing system......

KA - Vojenství

  • 2000 - 2003
  • 4 999 tis. Kč
  • 4 999 tis. Kč
  • MO
Project

The assessment of mining subsidence boundaries and verification of expected surface subsidence (AACBU39-05)

The verification and analysis of current mining subsidence calculation methodology and prognosis of mining subsidence in Ostrava-Karvina  Coal Basin.The proposal of upgrade of Notice No. 415/1991 Coll. in sense of assessment of ...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2006
  • 4 284 tis. Kč
  • 4 284 tis. Kč
  • ČBÚ
Project

Mathematical modelling of mine fire effect on air flow and propagating of mine fire product within mine ventilation network (GA105/03/0383)

inflammability a potential rise of mine fire in any place of underground mine cannot be excluded.The rise of mine fire is very dangerous for mine personnel not only due to developing and propagating of mine

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2003 - 2005
  • 2 032 tis. Kč
  • 1 672 tis. Kč
  • GA ČR
Project

Possibilities for mining the left reserves of the shut-down mines by non-traditional methods - the hydraulic borehole mining (GA105/97/0146)

The aim is to create a complete project that enables to mine the left coal reserves, other raw materials resp. from the underground of a shut-down mine using devices. It is not possible to mine such mine parts by t...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 1997 - 1999
  • 2 192 tis. Kč
  • 2 137 tis. Kč
  • GA ČR
Project

Research into the potential and possibilities of comprehensive use of underground mines after completion of mining activities, including so-called active conservation of mine shafts (TB050CBU001)

to avoiding negative experience of previous phasing out of mines in the Ostrava part caused by non-conceptuality and often spontaneous course of mining activities, when mines being phased out were not prepared for such fas...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2016 - 2016
  • 1 650 tis. Kč
  • 1 650 tis. Kč
  • TA ČR
Project

Personal mining lights for mining rescuers in extreme conditions (AACBUAN)

The aim is to get scientific based input materials for drafting laws for safety at work and safety at traffic in mines and also for carrying out of supervision of the state mining authority......

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2001 - 2002
  • 3 630 tis. Kč
  • 3 630 tis. Kč
  • ČBÚ
Project

Cause Analysis and Risk Predictin for Underground Mines Termination (GA105/05/0515)

Closing of the most underground mines in conditions of the Czech national economy has run in the atmosphere hostile to mining industry (e.g. from the ecological point of view). The official reason of the mines closing were ...

DH - Báňský průmysl včetně těžby a zpracování uhlí

  • 2005 - 2006
  • 819 tis. Kč
  • 809 tis. Kč
  • GA ČR
  • 1 - 10 out of 710