Filters
Increasing of Safety and Reliability of High-Voltage System at Self-consumption of Electrical Industry and Manufacturing Plants. (2A-2TP1/102)
Increasing of safety and reliability of high-voltage system at self-consumption electrical industry or manufacturing plant is principal purpose of project with using analysis and thereby contribute to increasing of safe...
JE - Nejaderná energetika, spotřeba a užití energie
- 2007 - 2010 •
- 4 700 tis. Kč •
- 2 938 tis. Kč •
- MPO
Řešení projektu: 1. 6. 2007 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (63%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Current clamp for HV networks with wireless communication (TQ03000130)
synchronization necessary to ensure reliable measurement. The system will enable: • Simple, accurate and reliable measurement of current and overcurrent in HV networksThe main goal is to create an innovative system for ...
Communication engineering and systems
- 2024 - 2025 •
- 5 764 tis. Kč •
- 4 843 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2024 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (84%)
Poskytovatel: Technologická agentura ČR
Intelligent methods for incresing of reliability of electrical networks (1ET100300414)
The main objective of the research project is an increase in safety and reliability of operation of the electric power system by developing new intelligent. Problems ofthe reliability in electric power eng...
JE - Nejaderná energetika, spotřeba a užití energie
- 2004 - 2008 •
- 16 169 tis. Kč •
- 16 169 tis. Kč •
- AV ČR
Řešení projektu: 1. 7. 2004 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Akademie věd České republiky
Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety (7H12003)
on Electric and ICE propelled vehicles and aiming at covering aspects not yet addresses in running ENIAC and ARTEMIS Automotive projects. The main novelties introduced through and future ICE vehicle,-energy saving and increased
JA - Elektronika a optoelektronika, elektrotechnika
- 2012 - 2015 •
- 9 476 tis. Kč •
- 3 604 tis. Kč •
- MŠMT
Řešení projektu: 1. 10. 2012 - 31. 5. 2015
Uznané náklady
Podpora ze státního rozpočtu (38%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Automated Data Collection System for Transmission Power Line Inspection Using UAVs (TK04020220)
and evaluation. The new solution will lead to improved reliability and safety of the electric transmission network.Regular inspection of electric transmission network elements is fundamental afte...
Energy and fuels
- 2022 - 2024 •
- 22 002 tis. Kč •
- 12 996 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2022 - 31. 12. 2024
Uznané náklady
Podpora ze státního rozpočtu (59%)
Poskytovatel: Technologická agentura ČR
Determination of the technical requirements for operation safety of electrical power networks and electric equipment for use in mines with danger of mechanic shocks and explosion of methane (AACBUAR)
Determination of the corresponding technical requirements for electrical power networks used in the 1st, 2nd and 3rd grade of mechanical shock danger, with operation and work safety viewpoint. For the power electrical
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2002 - 2003 •
- 1 900 tis. Kč •
- 1 900 tis. Kč •
- ČBÚ
Řešení projektu: 1. 1. 2002 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Český báňský úřad
Applied research and development toward improving safety of electric vehicles, and reduce their negative impact on the environment. (TA01030430)
The project aims to improve the safety of electric vehicles and reduce their negative impacts on the environment. Knowledge about increasing safety and reducing environmental impact of electric vehicles will be obt...
JR - Ostatní strojírenství
- 2011 - 2014 •
- 27 499 tis. Kč •
- 21 944 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (80%)
Poskytovatel: Technologická agentura ČR
Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety (7H12004)
and the reliability requirements in particular vs. thermal & power cycles and life time for the aggressive requirements of the control systems in advanced ICE or Electrically propelled processor coping with very high safety
JC - Počítačový hardware a software
- 2012 - 2015 •
- 3 458 tis. Kč •
- 2 881 tis. Kč •
- MŠMT
Řešení projektu: 1. 6. 2012 - 31. 5. 2015
Uznané náklady
Podpora ze státního rozpočtu (83%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Reliable Electric Power Network with Connected Alternative Power Sources (GA102/09/1842)
Submitted project deals with problems of electric power distribution networks interconnection into electric power system is nowadays very actual problem of electric power engineering. Connection of these sources do...
JE - Nejaderná energetika, spotřeba a užití energie
- 2009 - 2013 •
- 8 731 tis. Kč •
- 8 731 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety (7H12002)
in Automotive with Increased Reliability and Safety?, - is to develop advanced packaging haven?t yet addressed into the main running ENIAC and ARTEMIS Automotive projects in the automotive ,in particular for electrified ve...
JA - Elektronika a optoelektronika, elektrotechnika
- 2012 - 2015 •
- 9 741 tis. Kč •
- 8 116 tis. Kč •
- MŠMT
Řešení projektu: 1. 10. 2012 - 31. 5. 2015
Uznané náklady
Podpora ze státního rozpočtu (83%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
- 1 - 10 out of 7 839