Filters
Design and Development of the European Test Blanket Modules Systems (7G09050)
milestones identified by the ITER STAC: TBM Quality management system established ? 06/2009 TBMs (box) fabrication process validated at laboratory level ? 12/2009 TBMs system conceptual design delivered ? 12/2009 TBM
JF - Jaderná energetika
- 2009 - 2010 •
- 4 071 tis. Kč •
- 4 071 tis. Kč •
- MŠMT
Řešení projektu: 1. 4. 2009 - 30. 4. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Implementation of the mechanized tunnelling using tunnelling machines (TBMs and shields) in the Czech Republic - technical and legislative solution. (TITVCBU913)
The aim of the project is the implementation of the foreign experience with the mechanized excavation of underground structures using tunnelling machines (TBMs and shields) in the Czech Republic and the preparation of a unified legal and tec...
Mechanical engineering
- 2019 - 2022 •
- 3 801 tis. Kč •
- 3 801 tis. Kč •
- TA ČR
Řešení projektu: 1. 10. 2019 - 31. 3. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Technologická agentura ČR
Implementation of a new technology of monolithic tunnel lining driven by TBM in civil engineering (CK03000045)
The main project objective is development and research of a new energy-saving industrial technology of monolithic lining of TBM tunnels, securing time, space and transport savings, with its implementation in the field of underground construc...
Civil engineering
- 2022 - 2025 •
- 24 244 tis. Kč •
- 16 767 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2022 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (69%)
Poskytovatel: Technologická agentura ČR
Probabilistic Evaluation of the Rock Mass Input Parameters and Undegroun Structures Reliability Analysis with Numerical Method Utilization (TA01011816)
tunnels (TBM)....
JM - Inženýrské stavitelství
- 2011 - 2013 •
- 3 621 tis. Kč •
- 2 862 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (79%)
Poskytovatel: Technologická agentura ČR
Numerical Modeling of Strain Hardening Fiber-Reinforced Composites (GPP105/12/P353)
within the tunnel excavation using TBM method. The primary objective of the presented...
JI - Kompositní materiály
- 2012 - 2014 •
- 1 490 tis. Kč •
- 1 490 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 5 out of 5