All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

-
19852030

Join usingOrAnd

Join usingOrAnd

SelectAll/None
    • Show more

    • Show more

    • Show more

    • Show more

  • Show more

SelectAll/None

Join usingOrAnd

-

More filters

Projects

5 878 projects (0,113s)

Project

Dynamic heavy vehicle - bridge interaction (GA103/01/1528)

The main subject of the proposed project is an interaction of heavy vehicles and bridge structures. The first part of the project deals with the modification and verification of a heavy vehicle model (multibody sys...

JM - Inženýrské stavitelství

  • 2001 - 2003
  • 2 770 tis. Kč
  • 1 298 tis. Kč
  • GA ČR
Project

Vehicle scanning-based structure monitoring for cable supported bridges (GC21-32122J)

element formulation based-on curved beam theory and vehicle-bridge interactionThe aim of the joint research project is to contribute to bridge health techniques having the potential to provide the bridge ...

Civil engineering

  • 2021 - 2023
  • 5 812 tis. Kč
  • 5 812 tis. Kč
  • GA ČR
Project

Development of the bridge vehicle of new generation AM-70 EX (EG16_083/0009883)

Development of the bridge vehicle of new generation AM-70 EX...

JO - Pozemní dopravní systémy a zařízení

  • 2017 - 2020
  • 23 302 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Theoretical predictive models of interaction between varying and moving loads and bridges for structural health monitoring (GC17-26353J)

The following proposal for the joint research project will be focused on the theoretical development and experimental verifications for structural health monitoring of bridge structures using indirect method by a moving instrumented vehi...

JM - Inženýrské stavitelství

  • 2017 - 2019
  • 5 257 tis. Kč
  • 4 741 tis. Kč
  • GA ČR
Project

AM 50 Bridge-laying Automobile (70 t) (ORVTUPV200504)

The aim of the project is to develop the "AM 50 Bridge-laying Automobile (70 t)", which is intended for building a set of four identical bridge-laying automobiles with the ability to set up a mechanised bridge on fixed supp...

KA - Vojenství

  • 2005 - 2008
  • 82 856 tis. Kč
  • 82 856 tis. Kč
  • MO
Project

Impact of road transport infrastructure and bridge structure quality on road traffic safety improvements (GA103/04/0679)

frequency factors on surface transport routes and bridges, from collision of the vehicleImpact of Road Transport Infrastructure and Bridge Structure Quality on Road and bridges, their equipping, obstacles and oper...

JO - Pozemní dopravní systémy a zařízení

  • 2004 - 2006
  • 3 672 tis. Kč
  • 3 440 tis. Kč
  • GA ČR
Project

Stochastic vibration of beam structures due to moving random loads and wind actions. (GC13-34405J)

. This will prepare the realistic input for the numerical simulation of bridge deck aerodynamic coefficients used in flow-structure interaction problems. Due to the motion-dependent natureof the aerodynamic lift force and pitching m...

JM - Inženýrské stavitelství

  • 2013 - 2015
  • 3 756 tis. Kč
  • 3 756 tis. Kč
  • GA ČR
Project

Progressive crash barrier for vehicles and foot passengers (TA01031225)

The project aims to design a new type of progressive crash barriers for vehicles and foot passengers on the road bridges. Progressiveness lies in the technical and user behavior barriers, the economic indicators and aesthetic design...

JO - Pozemní dopravní systémy a zařízení

  • 2011 - 2013
  • 12 382 tis. Kč
  • 9 319 tis. Kč
  • TA ČR
Project

Load classification and adjustment design according NATO standard STANAG 2021 (1F44L/078/030)

The purpose of this project is MLC load classification of every construction and lenght type of TMS bridge set according to NATO standard STANAG 2021 and necessary adjustment of bridge deck. The next goal is design or adjustment of ...

JN - Stavebnictví

  • 2004 - 2007
  • 3 780 tis. Kč
  • 3 780 tis. Kč
  • MD
Project

Transport infrastructure design optimization with respect to increased durability and operation safety (TA03031099)

by the design of integral bridges which are known for their bigger endurance and durability. Another solved area is the track-bridge interaction of railway bridges with the long by the transition zones of brid...

JM - Inženýrské stavitelství

  • 2013 - 2015
  • 6 956 tis. Kč
  • 4 485 tis. Kč
  • TA ČR
  • 1 - 10 out of 5 878