All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

-
19852030

Join usingOrAnd

Join usingOrAnd

SelectAll/None
    • Show more

    • Show more

    • Show more

    • Show more

    • Show more

  • Show more

SelectAll/None

Join usingOrAnd

-

More filters

Projects

168 projects (0,086s)

Project

Methods of Public Resources Allocation and Efficency of Public Expenditures (GA402/02/1267)

Substantial change of the existing state of allocation of public sources in the Czech Republic calls for solving a complex tasks. Necessary changes of the system in the sphere of results of the controlled public expenditures and optimal ...

AE - Řízení, správa a administrativa

  • 2002 - 2003
  • 1 067 tis. Kč
  • 1 067 tis. Kč
  • GA ČR
Project

Belowground carbon allocation in Norway spruce stands (OC10040)

Description of mechanisms and processes of belowground carbon allocation (processes affecting the soil organic matter) in Norway spruce stands with different silviculture practices (thinning).......

GK - Lesnictví

  • 2010 - 2012
  • 1 470 tis. Kč
  • 1 470 tis. Kč
  • MŠMT
Project

Influence of managed care on efficiency of resource allocation and utilisation in the Czech health care system. (NO6084)

Tools of managed care will be uses to increase efficiency of resource allocation and utilisation. Health care provided both to managed care group and to control group will be monitored and evaluated.......

FG - Pediatrie

  • 2000 - 2002
  • 3 943 tis. Kč
  • 1 380 tis. Kč
  • MZ
Project

Transport network development in the Czech Republic to 2010 with an outlook to 2015 (CE804210105)

Proposal how to allocate investments for the transport network development in the Czech Republic up to the year 2010 with outlook up to the year 2015. Taking into consideration the changes of development of the transport demand as well as th...

JO - Pozemní dopravní systémy a zařízení

  • 2001 - 2005
  • 4 648 tis. Kč
  • 4 648 tis. Kč
  • MD
Project

Financing and Resource Allocation in Mental Health Care in Central and Eastern Europe (GAP403/10/0041)

, and political factors as well as national specifics of resource allocation in mental health countries. The project will also provide up-to-date information on allocation process......

AE - Řízení, správa a administrativa

  • 2010 - 2012
  • 1 326 tis. Kč
  • 1 326 tis. Kč
  • GA ČR
Project

Human Capital and Expected Return on Investment to Higher Education in the Czech Republic and in the European Union Countries (GA402/04/0039)

The project is aimed to the human capital theory and its influence on the resource allocation, both private and public to the higher education. The data education investement and possible optimal allocation of resources. This model ...

AH - Ekonomie

  • 2004 - 2005
  • 867 tis. Kč
  • 867 tis. Kč
  • GA ČR
Project

Determinants of Spatial Allocation of EU Cohesion Policy Expenditures in the Context of Territorial Impact Assessment (GA16-22141S)

The project concerns with chosen aspects of spatial allocation of EU Cohesion Policy expenditures in the programming period 2007-2013. First, spatial patterns relations and others. Second, determinants of spatial allocation of EU Co...

AE - Řízení, správa a administrativa

  • 2016 - 2019
  • 992 tis. Kč
  • 992 tis. Kč
  • GA ČR
Project

Optimization of long-haul-bus-terminals through a terminal slotm anagement and information system (7D15006)

Development of an application platform for process optimization of long-haul bus stoping points allocation inclusing allocation/distribution algorithm and end-user applications (for publics, for carriers).......

AP - Městské, oblastní a dopravní plánování

  • 2016 - 2018
  • 6 975 tis. Kč
  • 3 100 tis. Kč
  • MŠMT
Project

Allocation of Resources in the Czech Economy and Performance of the Material Sphere (GA402/94/0723)

AH - Ekonomie

  • 1994 - 1995
  • 181 tis. Kč
  • 362 tis. Kč
  • GA ČR
Project

Research of the Optimal Allocation of the Financial Resources for Maintenance and Recostruction of the Railway Infrastructure with Regard to Actual Technical State (CG922-082-910)

Create and by pilot way verify system for maintenance repairing and reconstruction decision, of the railway infrastructure on nation-wide and regional tracks and for optimal allocation of finance sources for mentioned repair achievement.......

AP - Městské, oblastní a dopravní plánování

  • 2009 - 2010
  • 1 483 tis. Kč
  • 1 260 tis. Kč
  • MD
  • 1 - 10 out of 168