All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

377 (0,104s)

Project

Greenhouse gas emission reduction with new blended binders and power plant by-products usage in the traffic engineering (CG912-046-520)

The proposal of the hydraulic binders replacement with blended binders with limestone and possible substitution with power plant by-products for lower-strenght building usage and greenhouse gass savings calculation......

JI - Kompositní materiály

  • 2009 - 2010
  • 2 710 tis. Kč
  • 2 000 tis. Kč
  • MD
Project

Study of effects of samples preparation on inorganic binders final properties (GA15-08755S)

technology on final properties of inorganic binders, especially cement and lime route is the preparation of blended cements by high energy milling with the use of alternative materials which will be used in blended cements...

JN - Stavebnictví

  • 2015 - 2019
  • 2 772 tis. Kč
  • 2 772 tis. Kč
  • GA ČR
Project

Research of new cement binders with an optimized content of non-traditional raw materials. (FT-TA/020)

This project is directed at a preparation of new economically and ecologically positive cement binders using non-traditional raw materials. A global appraisal of individual raw materials from the point of view of their usefulness in individu...

JN - Stavebnictví

  • 2004 - 2007
  • 13 117 tis. Kč
  • 8 639 tis. Kč
  • MPO
Project

High Performance Materials Derived from Industrial-Waste Gypsum (OK 327)

The project ERB1 C15 CT960741 is the part of the program INCO COPERNICUS 1997. The Research Project, High Performance Materials Derived from Industrial Waste Gypsum" has six separate Research tasks. VIEZ Brno was charged as the coordinator with the s...

JN - Stavebnictví

  • 1998 - 1999
  • 970 tis. Kč
  • 270 tis. Kč
  • MŠMT
Project

Efficient thermal treatment of sewage sludge and its application in blended cements (7AMB16PL044)

water treatment plant and access its applicability in blended binders based in composition of blended binder; g) experimental determination of basic physical, mechanical-friendly alternative binder in cem...

JI - Kompositní materiály

  • 2016 - 2017
  • 192 tis. Kč
  • 192 tis. Kč
  • MŠMT
Project

Reduction of silica-alkali reaction by using road hydraulic binders and blended cements with low alkali content for concretes for traffic construction (CG912-047-910)

Silica-alkali reaction control in concrete by alkali content lowering in cements and alkali binding with suitable admixtures during setting....

JJ - Ostatní materiály

  • 2009 - 2010
  • 3 283 tis. Kč
  • 2 730 tis. Kč
  • MD
Project

Research of siliceous fly ash after denitrification utilisation as a binder, as a blend to cement and alkali activated systems (TJ01000174)

in the following areas: - Ashes as a binder in the sense of ČSN EN 14227-15, - Ashes...

Civil engineering

  • 2018 - 2019
  • 3 320 tis. Kč
  • 2 822 tis. Kč
  • TA ČR
Project

Composition, properties, characterization and utilization of activated clay minerals for the preparation of composites for special using (GA103/03/0506)

of this promising binder in blended cements and in different non-cement composites. Thepresence of insufficiently utilized clays in the Czech Republic for the production of binders. The low burningtemperature needed to get...

DM - Tuhý odpad a jeho kontrola, recyklace

  • 2003 - 2005
  • 2 998 tis. Kč
  • 2 998 tis. Kč
  • GA ČR
Project

Utilization of FBC-P for Hydraulic Binders Production (GA103/07/0910)

for the preparation of blended hydraulic limes and on the other hand the utilization of FBC-P with the applicable binder and the way of FBC-P direct utilization for the burning of binders.The......

JN - Stavebnictví

  • 2007 - 2009
  • 2 007 tis. Kč
  • 2 007 tis. Kč
  • GA ČR
Project

Extending service life of concrete road pavements using mineral admixtures and blended cements (TH03020404)

Prolonging service life from 25 to 40+ years of concrete road pavements belongs to the main objective ot the project. Short service life stems from microcracks (0-200 um) which nucleate and grow over time. Fast autogeneous shrinkage of cement bi...

Civil engineering

  • 2018 - 2020
  • 8 972 tis. Kč
  • 5 371 tis. Kč
  • TA ČR
  • 1 - 10 out of 377