Filters
Determination of load-carrying capacity and lifetime of bridge structures (GA103/05/2066)
The project aims at obtaining new methods for more accurate evaluation of the load carrying capacity and lifetime of bridge structures (meta! as well as concrete), with the use of diagnostic, probabilistic and simulation methods, as...
JM - Inženýrské stavitelství
- 2005 - 2007 •
- 3 517 tis. Kč •
- 3 517 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2005 - 31. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Evaluation and optimisation of bearing capacity calculations based on FWD measurement results (TA01030464)
The purpose of the project is an optimisation of pavement bearing capacity. The comparison of different software used for bearing capacity evaluation and overlay design willbe carried out with selection of the best calculat...
JS - Řízení spolehlivosti a kvality, zkušebnictví
- 2011 - 2013 •
- 4 969 tis. Kč •
- 3 974 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (80%)
Poskytovatel: Technologická agentura ČR
Limit load- carrying capacity of transit pipelines with areal corrosion defects (GA106/95/0869)
JR - Ostatní strojírenství
- 1995 - 1997 •
- 1 465 tis. Kč •
- 1 465 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1995 - 1. 1. 1997
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Steel-concrete compression members using high-strength materials (GA103/09/0597)
Proposed project is oriented to the problems of load-carrying capacity of steel to the higher load-carrying capacity in the case of pure compression. In the case HSS and HPC the pure compression load-carrying
JM - Inženýrské stavitelství
- 2009 - 2011 •
- 2 914 tis. Kč •
- 2 914 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Development of a high capacity tramcar. (FA-E3/064)
Providing for the development of the high capacity tramcar. Resolution of the type - three-link or five-link type. Design of the selected variant. Project suggests design of main components of the high capacity link double-direction...
JO - Pozemní dopravní systémy a zařízení
- 2000 - 2002 •
- 72 464 tis. Kč •
- 30 000 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2000 - 1. 1. 2002
Uznané náklady
Podpora ze státního rozpočtu (41%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Armoured face conveyor for the shearer loader haulage and transporting broken coal from the face. (FI-IM4/129)
. The conveyor will carry the mining machine and allow its travel along the post. OSTROJ a.s. is currently able to produce equipment which is able to carry max. 1,2 mil. tonsper year it is necessary to commence research and developm...
JQ - Strojní zařízení a nástroje
- 2007 - 2009 •
- 2 785 tis. Kč •
- 845 tis. Kč •
- MPO
Řešení projektu: 3. 9. 2007 - 30. 9. 2009
Uznané náklady
Podpora ze státního rozpočtu (30%)
Poskytovatel: Ministerstvo průmyslu a obchodu
The influence of recreational use on the condition and development of biotopes in the selected LSPA (PLA Beskydy, Krkonoše National Park, PLA Jeseníky and Šumava NP and PLA) (SK/620/15/03)
of their carrying capacity....
DO - Ochrana krajinných území
- 2003 - 2007 •
- 8 120 tis. Kč •
- 8 000 tis. Kč •
- MŽP
Řešení projektu: 1. 10. 2003 - 31. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (99%)
Poskytovatel: Ministerstvo životního prostředí
Non-linear response of steel beam structures with influence of imperfections - a stochastic approach (GA103/99/P023)
. An influence of different kinds of imperfections on a carrying-capacity will be assessed an evaluated carrying-capacity, i.e. also quantities with random features, it would......
JN - Stavebnictví
- 1999 - 2000 •
- 363 tis. Kč •
- 363 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1999 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Feeding strategy of large herbivore mammals between forest and field habitats (GP206/03/P134)
. A basic condition of such management is determination of the carrying capacity ofthe carrying capacity of the environment and thus indirectly affect the intensity ofthe......
EG - Zoologie
- 2003 - 2005 •
- 685 tis. Kč •
- 685 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Development of Methods for increase of Reliability, Load carrying capacity and Life-Cycle Performance of Bridges (GA103/08/1677)
An assessment of lifespan of bridges is a multidisciplinary task where subjects from the fields of structural engineering, computer science and economics have to be involved. The approaches developed in the proposed project will represent efficient t...
JM - Inženýrské stavitelství
- 2008 - 2010 •
- 3 698 tis. Kč •
- 3 698 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 3 467